FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 137 · PDF page 137

project manager of daily changes to the aircraft and any problems encountered during flight test. Cooperation between the assigned manufacturing inspector and flight test pilot is crucial to the safe and professional completion of flight testing. The FAA flight test pilot should not fly a test aircraft without coordinating with the assigned manufacturing inspector or the certification branch project manager, as previously approved by the manufacturing inspector. This ensures that the manufacturing inspector or project manager released the aircraft for flight. This should not prohibit multiple flights, so long as the assigned manufacturing inspector has:

1 Reviewed all planned aircraft configurations for the desired test,

2 Conducted any necessary inspections, and

3 Coordinated this information with the FAA flight test pilot.

NOTE: The FAA flight test pilot makes the final acceptance of the test aircraft for flight, as it relates to the operation of the aircraft and the integrity of the test. In this phase, coordination with the FAA flight test specialist is emphasized.

(b) Instrumentation. A qualified agency should calibrate instruments, gauges, recording devices, and so forth, which are used in official flight test. Applicants should provide affidavits signed by the qualified agency. The qualified agency should give copies of the affidavits to the flight test personnel before flight. Also, the manufacturing inspector must determine that the equipment is properly installed and safe for operation. Additional functional test may be required after installation.

(c) Flight Loadings. The manufacturing inspector should determine if the applicant carried out the various loading conditions specified by the flight test specialist. This includes a determination that the ballast used is accurately weighed, located, and safely secured.

(d) Periodic Safety Checks. Throughout the FAA flight test program, the manufacturing inspector should determine that the applicant has a plan to ensure that the aircraft is given adequate inspection. The inspection should reveal any unsafe conditions that may develop. The applicant must correct those conditions before further FAA flight test participation. The applicant should coordinate the frequency and extent of such checks with the manufacturing inspector. The manufacturing inspector should participate in the checks whenever practicable to determine compliance. The manufacturing inspector and flight test specialist should have a system for informing each other of daily changes to the airplane and problems encountered during flight test.

5-16. USING ENGINEERING DATA.

a. Inspecting to Original and Final Production Drawings. For conformity inspection purposes only, the certification branch project manager encourages applicants to submit drawings that they can readily expand into final production drawings. The certification branch project manager realizes that this may not always be practical during product development and that it may be necessary for the manufacturing inspector to inspect engineering layouts or even sketches. When this happens, certification branch project managers should advise the applicant that, before they will approve the TC or STC,

Page 122 Par 5-15

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.