FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 45 · PDF page 45

(a) When submitting a TC application for design approval of a new model aircraft (e.g., airplane, glider, rotorcraft, balloon, or airship), aircraft engine, or propeller (see §§ 21.15 and 21.19), or for extensions of time according to § 21.17(d);

(b) When submitting an amended TC application for approval of a change in model designation, for adding new models before original issuance of the TC, and for approving a follow-on model after the initial issuance of the TC (see §§ 21.91 through 21.101) (the applicant must check Type Certificate in block 2, then, in block 4a, specify that the application is for an amendment and include the TC number; applicants may apply for any other amendments to the TC by a letter or other written notification);

(c) When submitting an application for a provisional TC (class I or II) or changes to a provisional TC (class I or II) that is desired before the standard TC is issued (see §§ 21.75, 21.81, and 21.83);

(d) When submitting an application for a provisional amendment to a TC for a follow-on model (see § 21.85); or

(e) When submitting an application for a change in category to a type-certificated model.

(2) PC Application. Application for a PC is made on FAA Form 8110-12 (refer to http://www.faa.gov/forms). Application for a PC may be made at the same time application is made for a TC, an amended TC, STC, or an Amended STC. However, the applicant cannot get a PC before a TC or STC is issued. The applicant must submit the application, accompanied by a document describing the organization in accordance with § 21.135 and one copy of their Quality Control (QC) procedures showing compliance with §21.137, to the manager of the CM section in which the applicant’s principal manufacturing facility is located (refer to Order 8120.22).

b. The establishment of a TC Project. The certification branch assigns a project number, a project manager, and specialists as required. AIR-600 assigns a project officer to determine AIR-600 involvement.

(1) Project Number. The certification branch or ODA holder assigns a project number to each certification project. See Appendix A of Order 8110.115 for numbering system details for FAA assigned project numbers. You must use the assigned project number in all correspondence, reports, and other documents pertaining to the project. If the project is either cancelled or closed before completion, then the certification branch must close or cancel the assigned project number within 90 days.

(2) Assignments and Duties of the Project Manager.

(a) The project manager is the assigned focal point in the certification branch who plans, reviews, evaluates, and coordinates all aspects of a certification project according to the CPP. When the project is small, generally involving a single certification branch engineer, the duties of project manager may be filled by that engineer. In this case, the engineer is called project engineer. For the purpose of this order, the term project manager includes project engineer. The applicant should be instructed to direct all project correspondence to the project manager at the certification branch where the application was submitted. See paragraph 2-4e of this order for further details on CPP development.

Par 2-4 Page 23

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.