FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
(b) The project manager initiates the CPP and coordinates with the project officer and the CMCB, if necessary. The final CPP is not prepared until detailed roles and responsibilities are discussed with the applicant at the preliminary type certification board (preliminary TCB) meeting.
(c) The project manager will identify the data required for the CPN as discussed in Order 8110.115.
(d) The project manager establishes all projects requiring significant involvement by technical personnel. The project manager also coordinates with the appropriate certification branch, CM section, AED, and AIR-600 managers in selecting project team members. The project team normally consists of the following:
1 A project manager,
2 Engineers or technical specialists,
3 Flight test pilots and flight test engineers,
4 Manufacturing inspectors,
5 AED operations and airworthiness inspectors, and
6 A project officer and other persons at the discretion of AIR-600.
NOTE: The certification project team is comprised of the individuals needed to conduct a certification project. A TCB is an FAA management team. The TCB is discussed further in paragraph 2-4d below.
(e) The project manager sends an acknowledgment letter to the applicant identifying the project number, project manager’s name, office mailing address, telephone number, and electronic mail address.
NOTE: Responses to applications can be sent by an electronic mail message, as well as a written response, to an applicant. The FAA policy on electronic records is found in Order 1370.81, Electronic Mail, Order 8000.79, Use of Electronic Technology and Storage of Data, and AIR Manual IR-04-01, Records Management Requirements Manual.
(3) Assignments and Duties of Pilots and Engineers. Engineers and pilots are signed to fill the technical needs of the particular project. The engineer or pilot evaluates the adequacy of the type design and substantiation data related to their assigned disciplines. They have discretion to review any of these data, such as critical material process specifications. Engineers or pilots maintain appropriate oversight of their designees. They use available resources, for example, peers, designees, technical specialists, Chief Scientific and Technical Advisors (CSTA), policy staff, and management, to make sound and timely technical decisions.
Page 24 Par 2-4
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source