FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 144 · PDF page 144

testing, all requirements of § 21.33 (b)(2) through (b)(4) and § 21.35 (a)(1) through (a)(4) must be met (see an explanation of (a)(4) (Applicant’s Flight Test Report) below. Concurrent flight testing is not the same as conducting research and development with the applicant prior to TIA. The main concern in the development of these regulations has been to prevent FAA crews from being exposed to undue hazards during flight tests. Since the advent of FAA Order 4040.26, this concern has been mitigated by the mandatory Risk Management Process imposed by the Order. This is a requirement prior to any FAA flight test (regardless of its risk level) and with a corresponding TIA or LOA.

(2) Applicant’s Flight Test Report. The applicant’s flight test report described in §21.35(a)(4) should detail the results of the applicant’s company or developmental testing, completed for the purpose of showing compliance with the applicable regulations. In the event concurrent testing (described in Paragraph 5-19(e)(1) above) is agreed by the FAA, it is recognized that reporting cannot be accomplished for tests the applicant has not previously completed. Before testing is conducted concurrently with the FAA under TIA, the applicant’s flight test report should sufficiently document that the aircraft has flown previously, is airworthy, and that it is in safe operating condition.

f. Hazardous Flight Tests. FAA flight test personnel are not authorized to participate in or conduct potentially hazardous flight tests until the flight test risk management process has been completed by the certification branch or the certification branch has reviewed and accepted the risk mitigation procedures proposed by an applicant with an FAA-approved risk management process.

g. Certification Flight Hours.

(1) As part of the TIR, the flight test crew (pilot and/or engineer) records certification flight test time. The TIR may also include all flights during which an FAA crew member is conducting required evaluations, including flight to and from local test areas, flight in the traffic pattern, and so forth. The TIR also includes the time required to conduct or witness systems evaluations and other certification tests, regardless of whether an FAA pilot is at the controls. Initial pilot familiarization may be considered official test time even though no specific tests are conducted.

(2) Certification flight time does not include ferrying to remote areas or tests conducted for purposes other than for determining compliance, regardless of whether an FAA pilot is at the controls.

5-20. FUNCTION AND RELIABILITY TESTING.

a. Responsibility. All technical specialties on the TCB may have some involvement in the function and reliability testing program.

b. Monitoring and Evaluation. The manufacturing inspector monitors the functioning of all cabin installations, evaluation of maintenance, and refueling at each stop. The manufacturing inspector should:

(1) Check critical parts and components as much as possible at each landing.

(2) Ensure the accuracy of the weight and balance, and the loading schedule

Par 5-20 Page 129

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.