FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
u. Type Certification Board Meeting (TCBM) – any formal meeting between the TCB and the applicant to coordinate the move to the next project phase or resolve issues preventing progress to the next phase. Examples include preliminary, interim, pre-flight, and final TCBMs.
v. Type Design – the engineering definition of a particular product. The type design consists of the following (see 14 CFR 21.31):
(1) Drawings and specifications,
(2) Dimensions, materials, and processes,
(3) Airworthiness limitations,
(4) (For primary category aircraft, if desired) A special inspection and preventive maintenance program designed to be accomplished by an appropriately rated and trained pilot- owner, and
(5) Other data to describe the product design, and to determine the airworthiness, noise characteristics, fuel venting, and exhaust emissions (where applicable).
w. Validation – as defined in Order 8110.52, Type Validation and Post-Type Validation Procedures, a special form of certification used to establish the compliance of an imported product to the importing state’s applicable airworthiness standards. See Order 8110.52 for additional information.
1-7. BACKGROUND AND DISCUSSION.
a. Order 8110.4, Type Certification, is primarily written for internal use by the FAA, its designees, and delegated organizations. The order provides procedures and policy for the type certification of products. The office of primary responsibility for this order is the Organization and System Policy Branch (AIR-630). Unless stated otherwise, the type certification process in this order applies to all U.S. TCs, including amended TCs and STCs.
b. Title 49 of the United States Code (49 USC) section 40101 and Subsequent.
(1) 49 U.S.C. § 40101 and subsequent re-codifies the Federal Aviation Act of 1958. Title 49 U.S.C. § 44701 directs the FAA to promote safety of flight of civil aircraft in air commerce by prescribing and revising minimum standards. These standards set requirements for the design, materials, workmanship, construction, operation, and performance of aircraft, aircraft engines, and propellers. The Aircraft Certification Regulatory Program (ACRP) was developed to accomplish this mission. Appendix 11 of this order gives the history of aircraft airworthiness regulations.
(2) As part of the ACRP, AIR administers the type certification program to determine compliance with the prescribed regulations and to ensure continued operational safety.
Page 8 Par 1-7
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source