FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
the manufacturing inspector may need to conduct a complete conformity inspection on the first production article using not only approved production drawings, but also original sketches and layouts. As an alternative, if applicants can show that they included the original sketches and layouts in the production drawings, then the certification branch project manager will not require this double conformity inspection before approving the type design. The manufacturing inspector may require additional validation when the applicant submits products for airworthiness certification or approval to ensure that the products represent the test articles.
b. Accepting Drawings That a DER Approved. When a DER may be involved, it should be accepted practice to conduct conformity inspections using DER-approved drawings. If the DER has been properly authorized, the certification branch project manager can accept as engineering approval a copy of the DER’s FAA Form 8110-3. The form should list drawings approved by the DER. The certification branch project manager can also create a program to allow DERs to issue request for conformity inspections and to disposition nonconforming hardware recorded on FAA Form 8100-1. In the request for conformity or TIA, certification branch project managers should mention by name DERs who they authorize to disposition unsatisfactory conditions. The FAA and applicant should document and agree on this program before the initial TCBMs. 5-17. AIRWORTHINESS CERTIFICATION OF PROTOTYPE PRODUCTS.
a. Determining Need for Airworthiness Certificate. When a potential type certification project becomes known, the manufacturing inspector should determine whether the applicant intends to seek an airworthiness certificate for the prototype product. If so, applicants should seek FAA conformity inspection when they start making the parts. Manufacturing inspectors should inform applicants that 14 CFR part 21, Subpart B requires them to include in the prototype all changes found necessary as a result of the test program. They should also inform the applicant their product must completely conform to the type design. NOTE: If this is not done progressively, then extensive disassembly, modification, and inspection may be necessary before airworthiness approval. Other manufacturing inspectors and designees can perform the progressive inspection. The inspector who completes the final airworthiness certification does not need to complete the entire progressive inspection personally.
b. Aircraft Requirements. Manufacturing inspectors should process the airworthiness certification of an aircraft following the requirements of 14 CFR part 21 and the directions of Order 8130.2. They should ensure applicants satisfactorily include all required changes in the prototype. Also, they should get a final FAA Form 8130-9 from the applicant. When applicable, the manufacturing inspector should review the final TCB report to determine whether the applicant resolved all outstanding items recorded in the report. Manufacturing inspectors should handle airworthiness approval of prototype engines and propellers in a similar manner. Before testing, they must get a final FAA Form 8130-9 for each product.
Par 5-16 Page 123
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source