FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 47 · PDF page 47

Engineers and pilots contribute to the preparation of Type Inspection Authorizations (TIA), request conformity inspection, and coordinate with FAA inspectors and their designees.

(4) Assignments and Duties of the Project Officer. The project officer is the focal point in AIR-600 for policy and is assigned to monitor a significant certification project according to the CPN. The project officer is responsible for ensuring that the project team is using current policy and guidance. The project officer also provides project-specific rules (for example, special conditions and exemptions) and policy (for example, acceptable means of compliance, ELOS, and certification basis) to the project team. The project officer works with the project manager to develop the CPP.

c. Certification Project Notification (CPN). The PCB will notify electronically AIR-600, the AED, and the CMCB of a certification project initiation for each project by transmitting the required CPN data as shown in figure 1 of Order 8110.115.

d. Form the Certification Team (and TCB). The FAA type certification team includes those FAA personnel needed to conduct the certification project and an FAA management team— the type certification board (TCB)—that oversees the project. A TCB is established only for projects of a certain magnitude. When a TCB is not necessary, the certification team manages the project and performs any functions of the TCB to the degree necessary.

(1) Certification Team members are assigned to a project by their respective managers. However, the project manager plays a critical role in the formation of the certification team by coordinating with the appropriate managers to ensure proper technical representation on

Par 2-4 Pages 25

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.