FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 72 · PDF page 72

FIGURE 2-12. IMPLEMENTATION PHASE – COMPLIANCE FINDING ACTIVITIES

FAA Review of Compliance Data ......................................................... 2-6n Review of Applicant’s Flight Test Results ............................................ 2-6o Flight Test Risk Management Process .................................................. 2-6p Pre-Flight TCB Meeting ........................................................................ 2-6q Type Inspection Authorization (TIA) .................................................... 2-6r Flight Test Conformity Inspection ......................................................... 2-6s Certification Flight Tests ....................................................................... 2-6t Operational and Maintenance Evaluations ............................................ 2-6u Instructions for Continued Airworthiness (ICA) ................................... 2-6v Function and Reliability (F&R) Flight Testing ..................................... 2-6w Aircraft Flight Manual ........................................................................... 2-6x Final TCB Meeting, Issuance of Type Certificate, & Data Sheet ......... 2-6y

n. FAA Review of Compliance Data. During this review, the FAA finds compliance with specific paragraphs of applicable airworthiness standards and aircraft noise and emissions requirements. The data are approved after all inspections, analyses, and necessary tests are accomplished with satisfactory results.

(1) Discontinuance Letter. The TCB will notify the applicant by letter when it becomes necessary to discontinue official FAA type certification inspections or tests for any reason. The letter should cite the applicable regulations and advise the applicant to notify the certification branch when the cause of the discontinuance has been corrected and a resumption of the type certification testing is desired.

(2) Notification of Non-Compliance, including projects that do not warrant a TCB. The TCB, or the project manager for projects that do not warrant a TCB, notifies the applicant (in writing) when a non-compliant item is found during FAA ground or flight tests, and it does not necessitate discontinuing type certification tests. The written notification must identify the non-compliant item and cite applicable regulations. The applicant must satisfactorily resolve all non-compliances before the FAA issues the TC.

o. The Review of Applicant’s Flight Test Results. The FAA reviews the applicant’s flight test report to determine that the airplane conforms with the type design and identifies the specific flight tests that will be reevaluated by the FAA’s test pilot. The project may proceed after a satisfactory examination of the applicant’s technical data.

p. The Flight Test Risk Management Process. The TIA will reflect adherence with established flight test risk management process following Order 4040.26, Aircraft Certification Service Flight Test Risk Management Program. This ensures the acceptability of flight test risks. Risk assessment is normally done by a safety review process where project and non- project personnel review a flight test plan. This determines potential hazards and recommended mitigating (or minimizing) procedures. In the risk management process:

Page 50 Par 2-6

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.