FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 51 · PDF page 51

Individuals participating in discussions should be identified by titles only.

e. Develop Certification Project Plan (CPP). The CPP defines the working relationship between AIR-600 and the PCB for a specific type certification project. The CPP is the principal project coordination tool that the project manager updates throughout the project. The CPP sets the proposed project schedule as well as the resources and responsibilities to be allocated from both AIR-600 and the PCB to support the applicant’s schedule. Early commitment of FAA resources combined with a realistic project schedule will enable AIR-600 and the PCB to plan and direct their resources more effectively. The CPP represents our plan to support the applicant’s schedule. The project manager and project officer should follow the CPP in draft form until the project develops sufficiently for preparation of a final CPP. The project manager submits the CPP final plan through the certification branch manager to AIR-600 manager for approval. The applicant’s certification plan may take the place of the CPP when it includes all the information that should be in the CPP and is coordinated with the project officer.

NOTE: The applicant’s certification plan and the CPP are combined to form the basis of the PSCP for those projects using the techniques and guidance from The FAA and Industry Guide to Product Certification.

f. The Preliminary TCB Meeting is the initial formal meeting that establishes the basis for all integrated certification planning combining the interests of engineering, flight test, manufacturing, and maintenance and operations. Use this meeting to determine if the TCB and the applicant are adequately familiar with the various aspects of the project and to determine whether the project is mature enough to begin defining the requirements. Obtain mutual commitment to the issues and acceptance of the risks before proceeding into the requirements definition phase. This meeting should:

(1) Update and further acquaint FAA personnel with the project,

(2) Work toward establishing the certification basis,

(3) Open discussion of design details and possible problem areas with specialists,

(4) Identify areas needing the formation of special compliance teams to attain the earliest possible resolution of potential problems,

(5) Identify novel or unique design features, materials, or processes, and

(6) Establish a schedule for the certification project.

NOTE: Developing the certification basis may require follow-up meetings between the certification branch and the applicant. If the certification basis cannot be established quickly and easily, consider re-assembling the certification team by scheduling an interim TCB meeting for finalizing the certification basis.

g. Issue Paper. An issue paper provides a means for identifying and resolving significant technical, regulatory, and administrative issues occurring during the certification

Par 2-4 Page 29

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.