FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
process. Issue papers are primarily intended to provide an overview of significant issues, a means of determining the status of issues, and a basis for a post-certification summary statement on how issues were resolved. See FAA Order 8110.112, Standardized Procedures for Usage of Issue Papers and Development of Equivalent Levels of Safety Memorandums, for detailed information regarding issue paper procedures, issue paper forms and templates, and a sample issue paper.
h. Issues Book. The project manager assembles issue papers and publishes them in the form of an issues book for distribution to the TCB members, the project team members, the applicant, and AIR-600. The issues book may be revised to add new issue papers or update existing papers without holding a formal TCB meeting, provided that the new or updated issue paper can be coordinated through the applicant and TCB.
i. The Project Specific Certification Plan (PSCP) is the primary project management tool for coordinating activities between the FAA and applicants choosing to implement the techniques and guidance described in The FAA and Industry Guide to Product Certification. The PSCP combines information from the applicant's certification plan and the FAA's CPP with additional project details to support an effective certification project. It is also the depository for milestones, performance measures, and information unique to the certification project. The FAA and the applicant's certification teams begin developing the PSCP when they have collected the information needed in the applicant's certification plan (discussed in paragraph 2-3d of this order) and the CPP (discussed in paragraph 2-4e of this order). This combined certification team adds additional planning information to meet the objectives outlined in The FAA and Industry Guide to Product Certification. Although the PSCP is a plan subject to change, the commitments made by each party are the expectations of the signatories. When developing a PSCP, ensure commitments:
(1) Remain within the authority of the signatories,
(2) Are consistent with FAA regulations or policy,
(3) Do not redefine certificate eligibility (for example, agreeing to a fixed certification date),
(4) Can be met even in circumstances less than ideal, and
(5) Consider obligations made to other projects and applicants.
j. Certification Basis. Early in a TC project, the FAA establishes the certification basis, defining the applicable requirements of 14 CFR for the issuance of the TC. The certification basis identifies the specific 14 CFR parts and amendment levels with which the applicant must show compliance before the issuance of the TC. The certification basis includes the applicable airworthiness standards for the category of the TC to be issued. It also includes the applicable aircraft noise, fuel venting. and exhaust emission requirements contained in 14 CFR. The FAA makes every effort to ensure the certification basis is correct at the beginning of the project and the applicant is advised of all regulatory aspects including operational requirements contained in other subchapters in 14 CFR. The certification basis is established by the FAA and agreed to by the applicant, based on a mutual understanding of the design features of the product to be certificated. Upon agreement of the certification basis, new policy will not be imposed unless
Page 30 Par 2-4
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source