FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
(4) TCB Functions. The TCB’s purpose is to acquaint the applicant and the FAA certification team with the certification project. They also identify and resolve significant problems, establish milestones and schedules for the overall accomplishment of the type certification project, review the applicant’s certification plan, review the proposed certification basis, and ensure all outstanding certification issues are resolved. The TCB establishes clear expectations and project assignments for the applicant and FAA certification team. When needed by the TCB, the project manager requests technical assistance or guidance for the project from AIR-600. Such a request should be made as far in advance as possible to facilitate work scheduling.
(5) TCB Meetings (TCBM) (for example, preliminary, interim, pre-flight, final) are held with the applicant throughout the project. Some meetings may be combined, and some meetings may be duplicated or divided by discipline or system as necessary. The chairman convenes the TCB as necessary and notifies the appropriate representatives with the time, date, and location of the meetings. If the number of meetings is decreased or combined, or the meetings are divided by discipline or system, the TCB chairman is responsible for determining all elements of the process are addressed, integrated, and completed. Members, with concurrence of the chairman, may designate an alternate as their representative at TCB meetings. Members of the TCB should be familiar with the project during the development phases and in advance of TCB meetings. This practice ensures knowledgeable participants in the TCB meetings. Members participate in the specific periods of the TCB activity, as required by the project under consideration. It is not mandatory for members to participate in every meeting.
(6) TCB agenda items and subsequent meeting minutes should be sent to the applicant. The meeting minutes should include the following information:
(a) TCB meeting type: familiarization briefing, preliminary, interim, pre- flight, or final,
(b) Manufacturer,
(c) Model and project number,
(d) Location and date of meeting,
(e) Personnel present at meeting,
(f) Purpose of meeting,
(g) Discussion of agenda items, and
(h) Specialty items: Major problems and actions to take.
NOTE: Each item or subject discussed should be identified and summarized under a separate heading with the appropriate regulations referenced. These items should include a discussion, expectations, and a conclusion. Expectations should include action item assignments and a schedule for completing any action items.
Page 28 Par 2-4
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source