EASA Means of ComplianceFinal — current published edition checked

MOC-2 SC-VTOL

Means of Compliance with SC-VTOL — Batch 2

Issue 3 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136

Source page 89 · PDF page 89

Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022

Condition VTOL

(C) Operations:

Operation Minimum Test Duration Ground operations 20 minutes IGE hover 5 minutes Level flight 1 hour Descent and landing - Ground running, taxiing, and IGE hover operations are generally the

most critical since the VTOL may be operating in recirculating snow. Twenty-five minutes, or the maximum allowed time in relation the aircraft limitations, under these extreme conditions is considered a reasonable maximum, both from the view of pilot stress and the maximum expected taxi time prior to take off in bad weather. One hour of level flight operation, or maximum expected flight

duration, under ½-mile visibility snow conditions is deemed to provide ample opportunity for accumulation to begin to build. Go-arounds and transitions to and back to wingborne flight, if applicable, should be included in these flight operations. The durations reported in the table above are minimum test duration

times based on experience with rotorcraft operations, to ensure that the snow accretion on the aircraft and windshield is representative of a worst-case scenario. Different durations can be agreed with EASA depending on the actual aircraft limitations or the expected operations.

(D) Provisions in the Aircraft Flight Manual:

Visibility restrictions or limitations, based on which falling and blowing

snow operations can be allowed, are not considered appropriate, as visibility may fluctuate rapidly in snowstorms. It is affected by the presence of fog or ice crystals, is not crew measured or controlled, and is difficult to estimate. Time limitations, other than possibly for ground and hover operations,

are not considered appropriate:

1. Since during cruise in snow conditions the aircraft is likely to be in

and out of heavy snowfall, it is not practical for the crew to measure the time spent in snow in level flight conditions. Thus, it is not appropriate to include time limitations in the AFM for level flight snow operations. 2. A practical ground and IGE hover time limitation of less than 25

minutes, or the maximum allowed time in relation the aircraft limitations, in recirculating snow may be considered. The expected action at the expiration of this specified time would be landing or transition to a safe flight condition where it has been shown that snow accumulations will not intensify or shed and so not cause unacceptable reduction in pilot visibility.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-2 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.