MOC-2 SC-VTOL
Means of Compliance with SC-VTOL — Batch 2
Issue 3 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136
Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022
Condition VTOL
FATO width required
(a) ‘Final approach and take-off area’ (FATO) means a defined area over which the final phase of the
approach manoeuvre to hover or land is completed and from which the take-off manoeuvre is commenced. (b) The FATO includes the rejected take-off area. (c) The FATO width required should be established and published in metres and feet, rounded up to the
next tenth.
Take-off distance required (TODRV)
(a) ‘Take-off distance’ (TOD) means the projected horizontal distance from the start of a take-off procedure
to:
For ConvTO: the point where the aircraft reaches 10.7 m (35 ft) above the take-off surface with the minimum climb gradient of 4.5 %; or For EConvTO: after the dropdown segment, the point where the aircraft reaches 10.7 m (35 ft) above the take-off surface with the minimum climb gradient of 4.5 %; or For VTO: the point where the aircraft reaches 10.7 m (35 ft) above h2 (defined in section 13 of this MOC) with the minimum climb gradient of 4.5 %.
(b) The TOD required for VTOL aircraft (TODRV) that provides safe obstacle clearance following a CFP being
recognized at TDP should be established and published in metres and feet, rounded up to the next tenth.
Rejected take-off distance required (RTODRV)
(a) ‘Rejected take-off distance’ (RTOD) means the length of the FATO required by the VTOL aircraft to
complete a rejected take-off in accordance with the Category in which it is operated, Enhanced or Basic. This value is provided in the AFM for comparison with the RTOD available for the FATO. (b) The RTOD required for VTOL aircraft (RTODRV) that provides safe containment following a CFP being
recognized at TDP should be established and published in metres and feet, rounded up to the next tenth.
TLOF size required
(a) ‘Touchdown and lift-off area’ (TLOF) means an area on which a VTOL aircraft may touch down or lift off. (b) The TLOF size (length and width) required for approved procedures should be established and published
in metres and feet, rounded up to the next tenth. (c) The minimum dimensions should be the larger of:
the minimum size of the surface to contain the undercarriage; the aircraft performance scatter during a landing after a Critical Failure for Performance (CFP) to a specific reference point; and the surface required to provide the minimum suitable visual cues for a landing after a CFP.
Vertical take-off and landing procedure
(a) The applicant may provide a procedure for a vertical take-off and landing, with a vertical segment from
the ground facilitating clearance of obstacles, for example in the urban environment (Figure 4 and Figure 5). (b) The AFM should then include the following values:
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-2 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source