Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136

Source page 43 · PDF page 43

Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022

Condition VTOL

3. Structural Failure Rate (Category Basic and Enhanced)

(a) The framework outlined in section (b) “Structural Failure Rate” of MOC VTOL.2250(c) may be used to

determine the probability of occurrence of the first failure, which is then subsequently used in the cascading scenario. (b) The qualitative approach of section (b) “Structural Failure Rate” of MOC VTOL.2250(c) cannot be used

to justify a Structural Failure Rate lower that 10-7 per flight hour. All three aspects should be addressed, i.e. design robustness, quality of the part and in-service continued structural robustness, however not necessarily equally.

MOC VTOL.2240 (e) In-Service Monitoring

(a) For the purpose of VTOL.2240(e) parts having an important bearing on safety in operations are parts the

failure of which has hazardous or catastrophic effects for the aircraft. (b) The provisions for In-Service Monitoring established in compliance with VTOL.2240(e) should include

the necessary means to verify the health and operating conditions to help ensure the continued durability, integrity and functionality of the part. Actions arising from a finding could in the future change the certification approach for similar components or lead to continued airworthiness action. (c) The applicant should define an In-Service Monitoring programme which should verify the continuity of

the effectiveness of design and maintenance provisions, as well other procedures, implemented to comply with VTOL.2240(a) and (b), VTOL.2250(a) and (c) and VTOL.2625 through the life of the type design. (d) The following means can be used to support the In-Service Monitoring programme:

Analysis of occurrence reports. Analysis of unscheduled removal rates. Results of scheduled maintenance. Strip Reports / Analysis at overhaul. Post-TC development and maturity tests. Additional inspection (non-destructive and/or destructive) and testing on selected high time or rejected components. Feedback from lead customers. Audits of subcontractors and suppliers of parts. Statistical process control data of manufacturing processes that are essential to ensure the integrity and/or functionality of the part. Review of concessions. Changes in utilization and operating environment. Operator / applicant working group activities. Health monitoring data. Usage monitoring data.

(e) The assessments required by the In-Service Monitoring programme should be performed at suitable

periods through the complete life of the subject component types, considering the types of operation, environment and ageing effects expected. In addition, the applicant should consider scheduling early evaluation opportunities to confirm the suitability of the inspection and/or other procedures developed under VTOL.2240. Consideration should be given to adding new samples and revising the programme when changes to the types of operation or environment occur.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-2 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.