MOC-2 SC-VTOL
Means of Compliance with SC-VTOL — Batch 2
Issue 3 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136
Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022
Condition VTOL
f(7) The first sentence is modified as follows: “The seventh major area is the dynamic loading and response requirements of §§ 27.241, 27.251, and 27.629 VTOL.2160, for vibration and resonance frequency determination and separation for aeroelastic stability and stability margin determination for dynamically critical flight structure.” f(8) The first sentence is modified as follows: “The eighth area is the special repair and continued airworthiness requirements of §§ 27.611, 27.1529, VTOL.2625 and 14 CFR part 27 Appendix A, for composite structures.”
Means of Compliance for structural durability of metallic structures in the category Basic
(a) General. Each SSE, as defined in Section 2 of this MOC, should be identified and evaluated under (b), (c),
(d), or (e). The following apply to each fatigue evaluation:
The procedure for the evaluation should be approved. The locations of probable failure should be determined. In-flight measurement should be included in determining the following:
(i) Loads or stresses in all critical conditions throughout the range of limitations in
VTOL.2200, except that manoeuvring load factors need not exceed the maximum values expected in operation. (ii) The effect of altitude upon these loads or stresses.
The loading spectra should be as severe as those expected in operation. The loading spectra should be based on loads or stresses determined under (a)(3).
(b) Fatigue tolerance evaluation. It should be shown that the fatigue tolerance of the structure ensures that
the probability of fatigue failure is extremely remote without establishing replacement times, inspection intervals or other procedures under MOC VTOL.2625. (c) Replacement time evaluation. It should be shown that the probability of fatigue failure is extremely
remote within a replacement time furnished under MOC VTOL.2625. (d) Fail-safe evaluation. The following apply to fail-safe evaluation:
It should be shown that all partial failures will become readily detectable under inspection procedures furnished under MOC VTOL.2625. The interval between the time when any partial failure becomes readily detectable under (d)(1), and the time when any such failure is expected to reduce the remaining strength of the structure to limit or maximum attainable loads (whichever is less), should be determined. It should be shown that the interval determined under (d)(2) is long enough, in relation to the inspection intervals and related procedures furnished under MOC VTOL.2625, to provide a probability of detection great enough to ensure that the probability of failure is extremely remote.
(e) Combination of replacement time and fail-safe evaluations. A component may be evaluated under a
combination of (c) and (d). For such component it should be shown that the probability of failure is extremely remote with an approved combination of replacement time, inspection intervals, and related procedures furnished under MOC VTOL.2625. (f) Fatigue strength: The structure should be designed, as far as practicable, to avoid points of stress
concentration where variable stresses above the fatigue limit are likely to occur in normal service.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-2 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source