EASA Means of ComplianceFinal — current published edition checked

MOC-2 SC-VTOL

Means of Compliance with SC-VTOL — Batch 2

Issue 3 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136

Source page 16 · PDF page 16

Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022

Condition VTOL

MOC VTOL.2120 Climb requirements

(a) For Category Enhanced, the climb gradient without ground effect, at 305 m (1 000 ft) above the take-

off surface, should be at least 2.5 %, for each combination of weight and CG, altitude, and temperature for which take-off data are to be determined, and for the duration of the flight:

following a critical failure for performance (CFP) and with the remaining lift/thrust engines at maximum continuous power, if approved, or at take-off power for aircraft for which certification for use of take-off power is requested; and with the landing gear retracted (if applicable) and the aircraft in cruise configuration; and at the speed selected by the applicant.

Note: The altitude of 305m (1 000 ft) is proposed as currently used for Category A helicopters. Different cruise altitudes can be considered if compatible with the departure and en-route profile.

See MOC VTOL.2115 and 2130 for specific climb requirements for take-off and balked landing.

(b) For Category Basic, the climb gradient without ground effect, at 305 m (1 000 ft) above the take-off

surface, should be at least 2.5 %, for each combination of weight and CG, in nominal conditions (no failure conditions), at ISA SL and for the duration of the flight.

MOC VTOL.2130 Landing

This MOC does not cover the approach before the landing and starts from a point at which the decision to land, from an operational point of view, has been taken.

Landing procedures

(a) The landing can be of two main types: a Conventional Landing (ConvL) or a Vertical Landing (VL):

A ConvL path starts at a Landing Decision Point (LDP, see below) and ends at the point where the aircraft reaches a stop at the FATO on the ground (after which it may taxi). The trajectory may have the most appropriate glide path foreseen by the applicant. A VL might be required to comply with obstacle separation when landing on a Vertiport in an Urban Air Mobility (UAM) environment. The applicant may choose to have, from a point along the approach after the LDP, a pure vertical trajectory.

(b) The landing procedures should be demonstrated to be consistently executable by flight crew of average

skill, as required by VTOL.2105(c). (c) The landing distance scatter and the maximum deviations from a nominal trajectory should be

determined by the applicant.

Landing decision point (LDP)

(a) The characteristic point along the landing flight path is the Landing Decision Point (LDP), which is defined

as the last point from which a balked landing can be performed. After LDP a balked landing is not assured. (b) If the aircraft is required to show continued safe flight and landing, then a landing should be possible

following a CFP before or after the LDP. (c) LDP should be identified with a combination of height, vertical speed and airspeed and/or ground speed.

View figures, tables and original page layoutOriginal source page Source page 16 · PDF page 16 of MOC-2 SC-VTOL

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-2 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.