MOC-2 SC-VTOL

Means of Compliance with SC-VTOL — Batch 2

Issue 3 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136

Source page 74 · PDF page 74

Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022

Condition VTOL

behaviour validation (crosschecked when necessary with partial system development bench or flight test results, analysis, desktop simulation) and engineering/operational judgment.

Means of Compliance

To qualify simulation benches and test rigs so that they can be used to substantiate compliance for certification, the following aspects should be addressed by the applicant:

(a) Identify/list all simulator benches and test rigs proposed in the Certification Programme to be used for

“simulation” and “laboratory test” compliance demonstrations (as per Appendix A to AMC 21.A.15(b)). (b) Controlled development process:

Simulation benches and test rigs usually integrate numerous real aircraft systems or components, and modelled systems or components. Although simulation benches and test rigs are not subject to certification, the design of such devices for use as a certification means is deemed of sufficient complexity to stipulate a formalized and structured development process.

Simulation benches and test rigs specifically developed to support a given certification project should have a formalized and structured development process to achieve the applicant own objectives for the scope and intended use. This development process should include the usage of problem reports to record identified issues and their associated corrections (see Section 3(c)(2)) When simulation benches and test rigs are re-used from another project, the applicant should propose justifications to ensure the correctness/appropriateness of the rigs for the intended purpose.

(c) Configuration management:

Simulation benches and test rigs configuration should be managed similarly to the test aircraft configuration with a traceability that covers all relevant systems and models as well as the human machine interface (HMI). A change control process should also be implemented. A detailed status of simulation benches and test rigs should be established for all certification tests (including tests performed without EASA participation) and briefed along with each test order before the certification tests:

(i) The configuration management of simulation benches and test rigs should include the

relevant elements for the test objectives (e.g. version of the flight control laws/software, crew alerting system and the electronic check list (ECL) for a “Simulation” test). (ii) Problem reports should be established and assessed at system test level for their effects

on the representativeness in all relevant aspects (e.g. Human Factor, Handling Qualities, System Performances). This would typically include deficiencies, process deviations and errors in definition or implementation of simulation benches or test rigs.

View figures, tables and original page layoutOriginal source page Source page 74 · PDF page 74 of MOC-2 SC-VTOL

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-2 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.