MOC-2 SC-VTOL
Means of Compliance with SC-VTOL — Batch 2
Issue 3 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136
Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022
Condition VTOL
The structure should be designed to withstand a condition of zero fuel in the wing or aerodynamic element at limit loads corresponding to:
(i) 90 percent of the manoeuvring load factors defined in MOC VTOL.2200, and (ii) Gust velocities equal to 85 percent of the values prescribed in MOC VTOL.2200.
The durability evaluation of the structure should account for any increase in operating stresses resulting from the design condition of (c)(1). The flutter, deformation, and vibration requirements should also be met with zero fuel in the wings or aerodynamic elements.
Jacking loads
CS 23.507 Amdt. 4 is accepted as a means of compliance
Mooring loads
(a) The mooring fittings and its support structure should be analysed for the loads resulting from the
maximum permissible mooring wind speed multiplied by 1.11. (b) The wind should be considered as acting parallel to the ground in any direction to the aircraft. Ground
gust conditions should also be considered. (c) All permissible mooring configurations, i.e. number of mooring lines and their range of angles from the
aircraft fitting, should be evaluated. (d) The maximum wind speed and gust conditions for mooring and the permissible mooring configurations
should be published in the Aircraft Maintenance Manual.
Towing loads (towbar)
CS 23.509 Amdt. 4 is accepted as a means of compliance for towing an aircraft with the use of a towbar.
Towbarless towing (aircraft with wheeled landing gear)
(a) General
Towbarless towing vehicles are generally considered as ground equipment and are as such not subject to direct approval by the (aircraft) certifying agencies. However, these vehicles should be qualified in accordance with the applicable SAE ARP documents. It should be ensured that the nose landing gear and supporting structure is not being overloaded (by static and dynamic (including fatigue) loads) during towbarless towing operations with these vehicles. This should be ensured by the aircraft manufacturer, either by specific investigations as described in (b) and (c) below, or alternatively, by publishing aircraft load limitations in a towbarless towing vehicle assessment document, to allow towbarless towing vehicle manufacturers to demonstrate their vehicles will not overload the aircraft.
(b) Limit static load cases
For the limit static load cases, the investigation may be conducted by rational analysis supported by test evidence. The investigation should take into account the influence on the towing loads of the tractive force of the towing vehicle including consideration of its weight and pavement roughness. The investigation should include all towbarless towing operation scenarios. Operations that are explicitly prohibited need not to be addressed.
(c) Durability evaluation
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-2 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source