EASA Means of ComplianceFinal — current published edition checked

MOC-2 SC-VTOL

Means of Compliance with SC-VTOL — Batch 2

Issue 3 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136

Source page 42 · PDF page 42

Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022

Condition VTOL

of chain reaction (incl. hazardous trajectory probability and associated second release probability). (C) If this overall probability of the second release (Pr) is less than 10-9 per flight hour,

the hazards can be considered to have been minimised and the analysis can stop there. (D) If this overall probability of the second release (Pr) is higher than 10-9 per flight hour,

the effect of the second impact should be assessed:

If the effect of the second impact is catastrophic, it must be extremely

improbable (Pi < 10-9 per flight hour). If the effect of the second impact is not catastrophic, the overall

probability of the third release should then be evaluated.

(E) The analysis should continue until the overall probability of the next release (Pr) or

impact (Pi) is less than 1 x 10-9 per flight hour, or all lift/thrust units have been assessed (Figure 2).

(iii) The residual risk for each lift/thrust unit and the whole aircraft should then be

quantified to verify that the combined risks do not exceed an acceptable level.

Second release Third release

… First release

yes

Pr extremely

end

no Catastrophic

improbable

yes

no

redesign

no

yes

Pr extremely

effect of impact

end

improbable

CAT

yes

no

…

Pi extremely

end yes

improbable

no

redesign

Pr = overall probability of the nth release occurring Pi = overall probability of the nth impact occurring

Figure 2: Methodology for the cascading failure evaluation for Category Enhanced

View figures, tables and original page layoutOriginal source page Source page 42 · PDF page 42 of MOC-2 SC-VTOL

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-2 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.