MOC-2 SC-VTOL
Means of Compliance with SC-VTOL — Batch 2
Issue 3 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136
Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022
Condition VTOL
the lift/thrust performances the lift/thrust operating procedures
The applicant should assess the impact of any lift/thrust configuration change with regards to these criteria. (c) If it is determined that VTOL performances and/or operating procedures should be adapted depending
on the lift/thrust configuration:
The crew should have a clear and easily interpretable means to know which configuration of the lift/thrust system is mounted Operating procedures impacted by the configuration should be provided in the flight manual The impact of the different configurations on the VTOL aircraft performances should be established by a combination of analysis, bench tests and flight tests. Following their determination, they should be published in the flight manual VTOL aircraft systems which use the configuration status of the lift/thrust system automatically (without human intervention), should receive this status also automatically.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-2 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source