MOC-2 SC-VTOL
Means of Compliance with SC-VTOL — Batch 2
Issue 3 — FINAL Source checked 2026-11-28
Scope, source and reading notes
Complete final batch 2 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.
Aerospace Consulting reference note: Second final batch of means of compliance. Adds and revises earlier material; MOC VTOL.2105 was excluded from this final publication for further revision.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 1fcaf1c7db56acce38f5379ba2117f1137dbc35be3fa6ee4136a0f572d856136
Doc. No: MOC-2 SC-VTOL Issue: 3 Date: 22 Dec 2022
Condition VTOL
take-off AEO rating, the 30 sec or 2 min. rating, the 2,5 min OEI rating, etc. The power ratings will be defined at project level, as they will depend on the overall configuration (rotor-borne or wing-borne), number of engines, and also failure cases (number of acceptable engine losses). Figure 2 depicts the trajectories and the engine power settings while considering the most critical condition: a Critical Failure for Performance (CFP) during the take-off phase at TDP.
take-off flight path
take-off distance
required
TDP
305 m (A)
(1 000’)
≥ 61 m (A)
(200’)
4.6 m
EConvTO
EConvTO
(15’)
VTOSS
TDP
10.7 m
4.6 m
(35’)
(15’)
ConvTO
ConvTO
h2
TDP
VTO
(A) See Note A
VTO
Figure 1: Possible take-off paths
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
SC-VTOL-02 and MOC-2 SC-VTOL — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source