CS-25
Large Aeroplanes
Amendment 28; corrected 20 November 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-25 Amendment 28, including AMC and appendices.
Aerospace Consulting reference note: Certification specifications and acceptable means of compliance for large aeroplanes, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 32f1a9acf26e8ceceb291d206bf07a7071f7f59f40f10c096bb17f34c6a58007
(b) The output of this step will consist of the list of means of compliance that will be used to verify the HF objectives.
3.2.7. Certification programme
The applicant should document the certification process, outputs and assessments described in the previous paragraphs. This may be done in a separate plan or incorporated into a higher-level certification programme.
3.2.8. Other deliverables
(a) A HF assessment programme should be produced for each assessment and should describe the experimental protocol (the number of scenarios, the number and profiles of the flight crew members, practical organisation of the assessment, etc.), the HF assessment objectives to be addressed, the expected crew member behaviours and the scenarios expected to be run. When required by the level of involvement, the HF assessment programme should be provided well in advance to EASA.
(b) A HF assessment report should be produced including at least the following information:
(1) a summary of:
(i) the configuration of the means used for the assessment;
(ii) the limitations/representativeness of the means used for the assessment;
(iii) the detailed HF assessment objectives;
(iv) the HF assessment protocol, including the number of sessions and number of flight crew members, type of flight crew members (test or operational pilots from the applicant, EASA pilots, customer pilots), a description of the scenarios, the organisation of the session (training, briefing, assessment, debriefing) and the observers;
(2) a description of the data gathered with the link to the HF objectives;
(3) in-depth analyses of the observed human performance issues;
(4) conclusions regarding the related HF assessment objectives;
(5) a description of the proposed way to mitigate the human performance issues (design change, improvements in procedures and/or training actions).
If EASA has retained the review of the assessment report as part of its level of involvement, then the applicant should deliver it after every HF assessment.
3.3. Certification strategy and methodologies
3.3.1. Certification strategy
(a) The HF assessment should follow an iterative process. Consequently, where appropriate, there may be several iterations of the same system-specific assessment, allowing the applicant to reassess the system if the previous HF test campaigns resulted in design, training or procedure changes.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Listed as related material by
Source-backedEvidence and scope
AMC 20-152A §8(a)(2)
Lists CS-25 without an amendment or specific paragraph.
Family reference; does not select a certification basis.
Supporting source