CS-25
Large Aeroplanes
Amendment 28; corrected 20 November 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-25 Amendment 28, including AMC and appendices.
Aerospace Consulting reference note: Certification specifications and acceptable means of compliance for large aeroplanes, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 32f1a9acf26e8ceceb291d206bf07a7071f7f59f40f10c096bb17f34c6a58007
I 25.4 Reliability requirements
(See CS 25.1309 and AMC 25.1309)
(a) The occurrence of an ATTCS system failure or a combination of failures in the ATTCS system during the critical time interval which –
(1) Prevents the insertion of the required thrust or power, must be shown to be Improbable;
(2) Results in a significant loss or reduction in thrust or power, must be shown to be Extremely Improbable.
(b) The concurrent existence of an ATTCS system failure and an engine failure during the critical time interval must be shown to be Extremely Improbable.
(c) The inadvertent operation of the ATTCS system must be shown either to be Remote or to have no more than a minor effect.
I 25.5 Thrust or power setting
The initial setting of thrust or power controls on each engine at the beginning of the take-off roll may not be less than the lesser of –
(a) That required to permit normal operation of all safety-related systems and equipment dependent upon engine thrust or power lever position; or
(b) That shown to be free of hazardous engine response characteristics when thrust or power is increased from the initial take-off thrust or power level to the maximum approved take-off thrust or power.
I 25.6 Powerplant controls
(a) General
(1) In addition to the requirements of CS 25.1141, no single failure or malfunction, or probable combination thereof, of the ATTCS system, including associated systems, may cause the failure of any powerplant function necessary for safety.
(2) The ATTCS system must be designed to perform accurately its intended function without exceeding engine operating limits under all reasonably expected conditions.
(b) Thrust or Power Lever Control. The ATTCS system must be designed to permit manual decrease or increase in thrust or power up to the maximum thrust or power approved for use following engine failure during take-off through the use of the normal thrust or power controls, except that, for aeroplanes equipped with limiters that automatically prevent engine operating limits from being exceeded, other means may be used to increase thrust or power provided that the means is located in an accessible position on or close to the thrust or power levers, is easily identified, and operated under all operating conditions by a single action of either pilot with the hand that is normally used to actuate the thrust or power levers.
(c) System Control and Monitoring. The ATTCS system must be designed to provide –
(1) A means for checking prior to takeoff that the system is in an operable condition; and
(2) A means for the flight crew to deactivate the automatic function. This means must be designed to prevent inadvertent deactivation.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Listed as related material by
Source-backedEvidence and scope
AMC 20-152A §8(a)(2)
Lists CS-25 without an amendment or specific paragraph.
Family reference; does not select a certification basis.
Supporting source