CS-25
Large Aeroplanes
Amendment 28; corrected 20 November 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-25 Amendment 28, including AMC and appendices.
Aerospace Consulting reference note: Certification specifications and acceptable means of compliance for large aeroplanes, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 32f1a9acf26e8ceceb291d206bf07a7071f7f59f40f10c096bb17f34c6a58007
Approach Landing (SAL) capability
(1) the all-engines-operating go-around as per standard procedure; and
(2) the one-engine- inoperative approach climb configuration with one engine having been made inoperative, for the following conditions:
(i) The selected steep approach angle;
(ii) An approach speed of VREF(SAL);
(iii) The most critical weight and centre of gravity; and
(iv) For propeller-powered aeroplanes, the propeller of the inoperative engine shall be at the position it automatically assumes following an engine failure at high power.
(f) In addition, for propeller-powered aeroplanes, it must be demonstrated that controllability is maintained following an engine failure at approach power and with the propeller at the position it automatically assumes.
(g) The height loss during the manoeuvre required by subparagraph (SAL) 25.5(e) must be determined.
(h) It must be demonstrated that the aeroplane is safely controllable during a landing with one engine having been made inoperative during the final stages of an all-engines-operating steep approach for the following conditions:
(1) The selected steep approach angle;
(2) An approach speed of VREF(SAL);
(3) The most critical weight and centre of gravity; and
(4) For propeller-powered aeroplanes, the propeller of the inoperative engine shall be at the position it automatically assumes following an engine failure at approach power.
(i) One-engine-inoperative steep approach.
It must be demonstrated that the aeroplane can safely transition from the one-engine- inoperative steep landing approach to the approach climb configuration for the following conditions:
(1) The selected steep approach angle;
(2) An approach speed of VREF(SAL)-1;
(3) The most critical weight and centre of gravity; and
(4) For propeller-powered aeroplanes, the propeller of the inoperative engine may be feathered.
[Amdt 25/13] [Amdt 25/21]
AMC to Appendix Q, (SAL) 25.5 Safe operational and flight characteristics
(a) For the approach demonstrations required by (SAL) 25.5(a), due account should be taken of:
(1) The systems’ aspects of the power/thrust levers being at idle (e.g. arming of ground lift dump);
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Listed as related material by
Source-backedEvidence and scope
AMC 20-152A §8(a)(2)
Lists CS-25 without an amendment or specific paragraph.
Family reference; does not select a certification basis.
Supporting source