CS-25
Large Aeroplanes
Amendment 28; corrected 20 November 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-25 Amendment 28, including AMC and appendices.
Aerospace Consulting reference note: Certification specifications and acceptable means of compliance for large aeroplanes, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 32f1a9acf26e8ceceb291d206bf07a7071f7f59f40f10c096bb17f34c6a58007
CS 25.479 Level landing conditions ................................................................................ 250
CS 25.481 Tail-down landing conditions ........................................................................ 251
CS 25.483 One-gear landing conditions ......................................................................... 251
CS 25.485 Side load conditions....................................................................................... 251
CS 25.487 Rebound landing condition ........................................................................... 252
CS 25.489 Ground handling conditions .......................................................................... 252
CS 25.491 Taxi, take-off and landing roll ........................................................................ 252
AMC 25.491 Taxy, take-off and landing roll ......................................................... 252
CS 25.493 Braked roll conditions .................................................................................... 267
CS 25.495 Turning ........................................................................................................... 268
CS 25.497 Tail-wheel yawing .......................................................................................... 268
CS 25.499 Nose-wheel yaw and steering ....................................................................... 268
CS 25.503 Pivoting .......................................................................................................... 269
CS 25.507 Reversed braking ........................................................................................... 269
CS 25.509 Towing Loads ................................................................................................. 269
AMC 25.509 Towbarless towing .......................................................................... 270
CS 25.511 Ground load: unsymmetrical loads on multiple-wheel units ........................ 272
CS 25.519 Jacking and tie-down provisions .................................................................... 273
EMERGENCY LANDING CONDITIONS ............................................................................... 275
CS 25.561 General .......................................................................................................... 275
AMC 25.561 General ............................................................................................ 275 AMC 25.561(b)(3) Commercial Accommodation Equipment .............................. 276 AMC 25.561(d) General ........................................................................................ 276
CS 25.562 Emergency landing dynamic conditions ........................................................ 276
AMC 25.562 Emergency landing dynamic conditions .......................................... 277
CS 25.563 Structural ditching provisions ........................................................................ 278
AMC 25.563 Structural ditching provisions .......................................................... 278
FATIGUE EVALUATION .................................................................................................... 288
CS 25.571 Damage tolerance and fatigue evaluation of structure ................................ 288
AMC 25.571 Damage tolerance and fatigue evaluation of structure .................. 290
Appendix 1 – Crack growth analysis and tests ..................................................................... 315 Appendix 2 – Full-scale fatigue test evidence ...................................................................... 317 Appendix 3 – Methods for inspection threshold determination .......................................... 323 Appendix 4 – Examples of changes that may require full-scale fatigue testing ................... 324 Appendix 5 – PSE, FCS, and WFD-susceptible structure ....................................................... 324
LIGHTNING PROTECTION ................................................................................................ 327
CS 25.581 Lightning protection ...................................................................................... 327
AMC 25.581 Lightning protection ........................................................................ 327
SUBPART D – DESIGN AND CONSTRUCTION ................................ 330
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Listed as related material by
Source-backedEvidence and scope
AMC 20-152A §8(a)(2)
Lists CS-25 without an amendment or specific paragraph.
Family reference; does not select a certification basis.
Supporting source