EASA Certification Specifications with AMCFinal — current published edition checked

CS-25

Large Aeroplanes

Amendment 28; corrected 20 November 2025 Source checked 2026-11-28

Scope, source and reading notes

Complete official CS-25 Amendment 28, including AMC and appendices.

Aerospace Consulting reference note: Certification specifications and acceptable means of compliance for large aeroplanes, using the corrected official publication.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 32f1a9acf26e8ceceb291d206bf07a7071f7f59f40f10c096bb17f34c6a58007

Source page 57 · PDF page 57

1.6 The three appendices provide additional reference material associated with ice accretion, artificial ice shapes, and aeroplane design features.

2 Related Requirements. The following paragraphs of CS-25 are related to the guidance in this AMC:

— CS 25.21 (Proof of compliance)

— CS 25.103 (Stall speed)

— CS 25.105 (Take-off)

— CS 25.107 (Take-off speeds)

— CS 25.111 (Take-off path)

— CS 25.119 (Landing climb)

— CS 25.121 (Climb: One-engine-inoperative)

— CS 25.123 (En-route flight paths)

— CS 25.125 (Landing)

— CS 25.143 (Controllability and Manoeuvrability - General)

— CS 25.207 (Stall warning)

— CS 25.237 (Wind velocities)

— CS 25.253 (High-speed characteristics)

— CS 25.1309 (Equipment, systems, and installations)

— CS 25.1419 (Ice protection)

— CS 25.1420 (Supercooled large drop icing conditions)

— CS 25.1581 (Aeroplane Flight Manual)

— CS-25, Appendix C

— CS 25, Appendix O

3 Reserved.

4 Requirements and Guidance.

4.1 General. This section provides guidance for showing compliance with Subpart B requirements for flight in the icing conditions of Appendix C and Appendix O to CS-25.

4.1.1 Operating rules for commercial operation of large aeroplanes (e.g. Part-CAT1,

CAT.OP.MPA.250) require that the aeroplane is free of any significant ice contamination at the beginning of the take-off roll due to application of appropriate ice removal and ice protection procedures during flight preparation on the ground.

4.1.2 For certification for flight in the icing conditions described in Appendix C of CS-25,

CS 25.21(g)(1) requires that an aeroplane meet certain performance and handling qualities requirements while operating in the icing environment defined in Appendix C. In addition, CS 25.1420 requires applicants to consider icing conditions beyond those covered by Appendix C. The additional icing conditions that must be considered are the supercooled large drop icing conditions defined in Appendix O. CS 25.21(g)(2) and (3) respectively provide the performance and handling qualities

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-152A

Listed as related material by

Source-backed
Evidence and scope

AMC 20-152A §8(a)(2)

Lists CS-25 without an amendment or specific paragraph.

Family reference; does not select a certification basis.

Supporting source

Copy reference

Select and copy the citation below.