CS-25
Large Aeroplanes
Amendment 28; corrected 20 November 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-25 Amendment 28, including AMC and appendices.
Aerospace Consulting reference note: Certification specifications and acceptable means of compliance for large aeroplanes, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 32f1a9acf26e8ceceb291d206bf07a7071f7f59f40f10c096bb17f34c6a58007
Figure 1 — CMR development process
Certification Process
TC application
Design
Note 1: As part of the SSA acceptance, the CCMRs should be agreed by EASA
System Safety Analyses (25.1309, 25.671, 25.783,
25.901, 25.933, etc.)
(Paragraph 10)
Note 1
Note 2: The disposition activity involves the TC/STC holder, EASA, and an optional Advisory Committee (e.g. CMCC). The disposition of each CCMR and the means in place to ensure that SSA assumptions are protected in service should be accepted by EASA.
Significant Latent Failures
CCMRs
not requiring
Disposition of scheduled maintenance
CCMRs
tasks identified for major failure conditions
(Paragraph 11)
Disposition of each
Note 3
ISC/MRB
Note 4
CCMR (Paragraph 11)
Note 2
CMRs
CCMRs accomodated by compatible
Adequate scheduled maintenance
Note 3: Discussion and feedback with ISC in order to revise, if justified, the MSG-3 analyses and the associated MRBR tasks intents/intervals.
MRBR tasks
tasks
Certification
Authority
approval
CMR documentation
(ALS)
Note 4: Where the SSA identifies the need for a scheduled maintenance task, the CMR designation may also be used to detect a latent failure that would, in combination with one specified failure or event, lead to a major failure condition. This CMR designation may be necessary if an adequate scheduled maintenance task has not been identified in other Instructions for Continued Airworthiness.
Reference
TCDS
Certification Process
ALS: Airworthiness Limitations Section CMR: Certification Maintenance Requirement CCMR: Candidate Certification Maintenance Requirement ISC: Industry Steering Committee MRB: Maintenance Review Board MRBR: MRB Report TC: Type Certificate TCDS: Type Certificate Data Sheet
10 IDENTIFICATION OF CANDIDATE CMRs (CCMRs)
a. The SSA should address all significant latent failures.
b. Credit may be taken for correct flight crew performance of the periodic checks required to demonstrate compliance with CS 25.1309(b). Unless these flight crew actions are accepted as normal airmanship, they should be included in the approved Aeroplane Flight
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Listed as related material by
Source-backedEvidence and scope
AMC 20-152A §8(a)(2)
Lists CS-25 without an amendment or specific paragraph.
Family reference; does not select a certification basis.
Supporting source