FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 76 · PDF page 76

meet to advise the applicant on any noncompliance with the airworthiness standards and appendices. These efforts should be coordinated with the project manager.

(d) The AED team members report the status of the ICA and AFMs to the project manager during the regular FAA internal meetings and whenever there is a need or awareness of concerns. The AED team members should also provide a status briefing on the ICA and AFMs at each formal TCB meeting.

(e) During the type certification process, the AED airworthiness team member uses experience and knowledge of current maintenance practices to select items from the ICA for validation. These items may include instructions and procedures for maintenance, preventive maintenance, and servicing. Validation of a procedure may require it to be demonstrated on the product.

(f) It is possible an aircraft could be type certificated and not be determined to be operationally acceptable under the applicable regulations. These inconsistencies may be avoided by proper and timely AED involvement. The AED responsibility to evaluate operational suitability and type rating requirements may require the AED pilots fly the aircraft through prescribed type rating maneuvers using AFM procedures. This may be accomplished during the certification flight test program and may require the allocation of flight time so that appropriate findings can be made.

(3) Flight Standardization Board (FSB). An FSB determines the aircraft type rating requirement for both new and modified models of aircraft that require type ratings. It also develops the minimum training requirements used for flight crewmember qualification. Board membership includes operations inspectors from district offices, representatives from the Air Transportation Division , a board chairperson from AED-Operations who performs or directs the tasks of the FSB, and an alternate chairperson. The FSB determines the operational suitability of the aircraft and its systems; requirements for flight crew training aids; type rating requirements for pilots; any unique or special training requirements; and jump seat, flight crew rest, and sleeping quarters suitability. The FSB also determines emergency evacuation capability, the closure of flight standards issue papers, and other tasks as appropriate.

(4) Flight Operations Evaluation Board (FOEB). The FOEB develops the MMEL and accomplishes an operational evaluation of the aircraft. Board membership typically includes airworthiness inspectors, an operations inspector, a flight test pilot, an AIR-600 representative, and, as chairperson, an AED operations inspector.

(5) Maintenance Review Board (MRB). An applicant may use the procedures in AC 121-22, Maintenance Review Board, for those aircraft intended primarily for air carrier environment use. Those procedures will develop and produce tasks and associated time-in­ service intervals for the initial maintenance time limitations in an air carrier’s continuous airworthiness maintenance program. Also, the manufacturer may use the appropriate tasks and time intervals produced by the MRB process to show compliance with the inspection program requirements of the certification rules (for example, §§ 33.75, XX.571, XX.901, XX.1309, XX.1529). However, the applicant is not required to use the MRB process. An MRB

Page 54 Par 2-6

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.