FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 54 · PDF page 54

(a) FAA/Applicant Development of the Special Condition. Special conditions are rules of particular applicability that are developed for a particular certification project due to its unique (with respect to the airworthiness standards in the certification basis) design features. Special conditions may be developed using parts taken from other airworthiness standards. For example, a normal category 14 CFR part 23 airplane certification basis may include 14 CFR part 25 airworthiness standards appropriate to the design feature in question. The FAA will publish special conditions for public comment unless the circumstances in 14 CFR 11.38 apply to the project. The Administrator has delegated authority for issuing special conditions to AIR-600. The FAA uses the issue paper procedures described in FAA Order 8110.112 to develop the Federal Register Notice requesting public comment. Guidance for the applicant is found in AC 20.166, Issue Paper Process.

(b) Urgency of Action. At the time of the preliminary TCB meeting, the certification branch sets a date to establish the initial special conditions. These special conditions may be modified, and additional ones issued as technical information develops during the type certification project. In certain cases, the project's importance or urgency may require faster handling than typically scheduled. When the certification branch believes it has such a case, it should arrange a meeting with AIR-600 and the applicant. AIR-600 should be able to expedite the rule making procedure for the special conditions with the input from this meeting.

(c) Procedures for Issuing Special Conditions. A certification branch drafts proposed special conditions with reference to the application date for a TC. The applicant, AIR- 600, and any other interested persons deemed appropriate work together to formulate the proposal. The proposals are forwarded to AIR-600 with full particulars and justification for each special condition as described in the next paragraph. It is essential that the list of special conditions be complete, as it becomes part of the certification basis and forms an exact record of the rules applicable to the product. When the application is for an amended TC, an STC, or an amended STC, apply the requirements of 14 CFR 21.101(d). The basis and content of special conditions are generally developed via the issue paper process. In cases where the design feature is covered by a specific objective rule, do not use a special condition as a method or technique to show compliance with the rule. For example, in the 1980s the use of composites for primary structure on 14 CFR part 23 airplanes generated a need for special conditions. In 1993, 14 CFR part 23 was revised to include appropriate standards for using composites as primary structural components. So, composite special conditions are no longer appropriate. If the FAA determines that a special condition is appropriate, and the applicant indicates that they intend to comply voluntarily, then the special condition should still be proposed.

(d) Justification. Complete information from the certification branch is needed to cover the general characteristics of the aircraft, or other products, and their unusual design features. When the certification branch prepares special conditions, they should include all the necessary details and justification before forwarding them to AIR-600. Incomplete information or insufficient justification may delay the processing of the special conditions. The following information should be included:

Page 32 Par 2-4

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.