FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
d. Certification Plan. All TC applicants are required to submit a certification plan to the FAA and to keep it current throughout the project. A certification plan addresses the information listed below. For simple projects, expect complete certification plans as part of the application package. For complex projects, portions of the information needed in the certification plan will not be known at the time of application. Expect the applicant to provide as much information as possible with the initial submittal and supply the rest as it becomes known. At the time of application, the extent and depth of the information in the certification plan should be sufficient to determine the feasibility of the applicant’s proposed schedule. When the certification plan does not give the FAA assurance to the applicant’s understanding of the scope and magnitude of the certification project, the FAA should reject the application and consider the need for another familiarization briefing. When the FAA accepts the application with an incomplete certification plan, the certification plan must be completed (see paragraph 2-5d of this order) and include the following information before entering the implementation phase:
(1) General information including applicant identification, application date, model designation, and so forth.
(2) A description of the proposed design or design change including sketches and schematics.
(3) The intended regulatory operating environment (for example, 14 CFR parts 91, 121, and 137). This should identify the kinds of operations for which the product will be used, and the kind of program under which the product will be maintained.
(4) The proposed certification basis including applicable regulation paragraphs and subparagraphs with amendment levels, exemptions, ELOS findings, and special conditions.
(5) A description of how compliance will be shown (ground test, flight test, analysis, similarity, or other acceptable means of compliance). The description of the means of compliance should be sufficient to determine that all necessary FAA data will be collected, and all findings can be made.
(6) A list of documentation that will be submitted to show compliance with the applicable certification basis, and how the applicant will ensure that all showings have been made. This can be accomplished using a compliance checklist addressing each section of the regulations applicable to the product.
(7) A list of test articles to be used to generate compliance data. Identify any features or attributes for which special instructions to the manufacturing inspector will be necessary to ensure the test article meets the requirements of its tests (for example, dimensions at one or the other end of a tolerance band).
(8) A description of how the continued operational safety requirements will be met after the TC is issued.
(9) A project schedule including major milestones, such as preliminary hazard analysis submittal dates, substantiating data submittal dates, conformity and testing completion dates, and expected date of final certification.
Par 2-3 Page 21
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source