FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
5-14. TEARDOWN INSPECTION. The manufacturing inspectors may need to witness teardown inspection of test articles after structural testing. Teardown inspection of test articles after endurance testing is a specific requirement of 14 CFR parts 33 and 35. The manufacturing inspector and the certification branch project manager should witness these activities. The applicant should not clean or disassemble the test article until the authorized manufacturing inspector is present. The applicant’s inspections should be conducted as follows:
a. Step 1 – The manufacturing inspector should verify the applicant carefully notes the appearance of subassemblies during the teardown and before complete disassembly. The applicant should specifically note:
(1) Any abnormal leakage in valves, seals, fittings, and so forth, (2) Signs of excessive, or lack of, lubrication, (3) Excessive coking, (4) Metal or foreign particles in the oil screens or passages, (5) Parts that stick or break, (6) Lack of freedom of moving parts, (7) Breakaway torques, and (8) Any other condition that may not be noticeable after complete disassembly and cleaning.
b. Step 2 – Manufacturing inspectors should:
(1) Verify all parts are thoroughly clean and visually inspected for signs of galling, metallic pickup, corrosion, distortion, interference between moving parts, and cracks,
(2) Check highly finished surfaces for condition and discoloration due to excessive heat and lack of lubrication,
(3) Pay special attention to bearings, gears, and seals, and (4) Carefully inspect engine pistons, cylinder heads, and turbine assemblies for signs of cracking or burning.
c. Step 3 – Per the test plan, the manufacturing inspector should verify both ferrous and nonferrous stressed parts are inspected for incipient failures by suitable nondestructive testing methods. Examples of nondestructive methods are magnetic particle inspection, x ray, penetration, and ultrasonics.
d. Step 4 – Manufacturing inspectors should verify that all parts subject to wear or distortion are dimensionally inspected to determine the extent of change during the test. To do
Par 5-14 Page 119
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source