FAA Order 8110.4C
Type Certification
8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28
Scope, source and reading notes
FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.
Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4
f. Process Phase Evaluation. The manufacturing inspector and the certification branch project manager can recommend approval or rejection of the process after the five phases that follow have been completed:
(1) Phase I. The manufacturing inspector and the certification branch project manager should evaluate the basic information of the process. It is important to see that the process information is orderly and complete. Otherwise, it may lead to misinterpretation and confusion, causing the end article to exceed type design limits.
(2) Phase II. Manufacturing inspectors and certification branch project manager should review the actual process and the process specification. During the review, they should look for the variables that must be controlled to ensure a conforming and consistent product. Some variables that may affect product quality are:
(a) Raw materials and equipment used to make the part,
(b) Production facilities and environment,
(c) Inspection and test equipment, and
(d) Production operators.
(3) Phase III. The manufacturing inspectors and the certification branch project manager should verify that the process specification identifies ways to control the variables. These controls should establish:
(a) The unit of measure and acceptance limits,
(b) A description of the measurement techniques, and
(c) Actions to take when the actual measurement does not meet acceptance standards.
(4) Phase IV. Manufacturing inspectors should verify that the articles are being processed following the process specification. They should also verify the material, methods, tools, and equipment called for in the specification are being used. Since the end results depend on closely following the process instructions, correct any deviation or discrepancy on the initial runs.
(5) Phase V. Since the inspection of the processed articles is the main point of any process evaluation, the manufacturing inspector should determine whether the process can consistently produce articles in conformity with the type design requirements. The applicant should describe this process in the quality plan. When the process is followed, all parts produced should be of equal quality.
g. Non-Destructive Inspection Method Evaluation. The procedure for evaluating a nondestructive inspection (NDI) method is similar to the procedure in paragraph 5-6f above.
Par 5-6 Page 115
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source