FAA FAA orderActive

FAA Order 8110.4C

Type Certification

8110.4C — Changes 1–7 incorporated (2023-10-20) Source checked 2026-11-28

Scope, source and reading notes

FAA type-certification procedures for FAA personnel and relevant designees; consolidated publication incorporating Changes 1 through 7. Base publication catalog date: 2005-10-12; latest included change: 2023-10-20.

Aerospace Consulting reference note: Describes the type-certification process and coordination of design approval, including compliance findings, testing, and certification documentation.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 12d96559b86bef5eba9ba2ac0309a8ca58c0121b7055a6238b867bda7dbd5dd4

Source page 114 · PDF page 114

(b) The STC amendment introduces a new major change in type design as discussed in paragraph 4-2 above.

(c) The proposed change will revise the limitations and conditions section of the STC.

b. In addition to FAA Form 8110-12, the applicant must include a detailed description of the modification, the type of aeronautical product, information on the manufacturer and model number of the aeronautical product as specified on the TCDS involved, location of the modification to be conducted (design and installation), a letter outlining who will prepare the engineering data required to substantiate the change, and a schedule for completion of the project. The applicant should also submit a statement, if necessary, that a project initiation meeting is needed or desired. 4-17. ESTABLISHING AN STC PROJECT. The certification branch establishes STC and amended STC projects using the same process for establishing TC and amended TC projects. See Order 8110.115 for detailed information on how to establish a certification project and how to transmit the CPN required data to AIR-600, the CMCB, and AED. Also, direct the applicant to review FAA AC 21-40, Application Guide for Obtaining a Supplemental Type Certificate.

4-18. ESTABLISHING CERTIFICATION BRANCH TO CERTIFICATION BRANCH COORDINATION. Refer to Order 8110.115 for procedures to be followed by both the PCB and the CMCB. Refer to appendix C of Order 8110.115 for a list of types of projects that must be coordinated between the PCB and the CMCB.

Page 96 Par 4-16

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.37G

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.