EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 418 · PDF page 418

(ii) Each test should be performed on different tested parts. These tested parts should include, as a minimum, the monitored component(s) and any surrounding elements that, when replaced, may significantly influence the test results.

(iii) The set-up and installation should be adequate for the purpose of each test. The applicant should assess the overall testing plan and ensure that all the elements in each test adequately fulfil its purposes. In this respect, the applicant may choose to simplify the purposes of each test performed (i.e. simpler and cheaper tests) and extend the number of tests to ensure that the same level of information can be adequately derived. This may be used to minimise the number of tests performed in complex fully representative set-ups.

(iv) Typically, a fully representative environment from a vibration point of view is required to successfully complete the evaluation of performance of the VHM system. Therefore, the applicant should ensure that any test installation used is appropriate from this perspective. In addition, the applicant should consider performing verification on the rotorcraft. Alternatively, available service data may be justified to be applicable and adequate to fulfil this purpose.

(v) The applicant should consider that a test for the purpose of evaluating the characteristics of the failure progression or the likelihood of detection would typically not be considered successful or unsuccessful. It is understood that such tests would be defined to gather certain data representing specific parameters and conditions. As long as that data is gathered and considered valid, the test should not be considered unsuccessful. Some examples of tests that would be considered unsuccessful and would require to be repeated include:

(A) The mechanical system tested with a particular damage or degradation suffers unrepresentative deterioration in another area of the system that renders the vibration data not representative.

(B) An artificial damage is introduced to initiate certain damage or degradation, but this does not occur in test.

(C) In introducing a specific damage or degradation artificially, the component(s) involved are damaged in excess, making the evaluation of the characteristics of the failure progression not representative.

(g) Controlled service introduction (CSI) — Examples of KPIs and recommended targets

A list of KPIs and targets is provided in Table 2 below, for reference. The applicant should note that the list of KPIs and targets provided are only generic reference values and should be adapted, as needed, considering the characteristics and needs of each VHM system, the purpose and criticality of its applications, and the objectives of the CSI.

Table 2: CSI performance objectives and associated KPIs and targets

CSI objectives CSI KPIs CSI targets

KPI-1.1 < 1E-03 per fleet flight hour

1. Acquisition KPI-1.1: Number of events without a full VHM data set acquired within the interval corresponding to the minimum acquisition frequency

KPI-1.2: Average number of complete data sets acquired per flight hour

KPI-1.2 > 1 per individual rotorcraft flight hour

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.