CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
CS 29.77 Landing Decision Point: Category A
ED Decision 2003/16/RM
(a) The landing decision point (LDP) is the last point in the approach and landing path from which a balked landing can be accomplished in accordance with CS 29.85.
(b) Determination of the LDP must include the pilot recognition time interval following failure of the critical engine.
CS 29.79 Landing: Category A
ED Decision 2003/16/RM
(a) For Category A rotorcraft:
(1) The landing performance must be determined and scheduled so that if the critical engine fails at any point in the approach path, the rotorcraft can either land and stop safely or climb out and attain a rotorcraft configuration and speed allowing compliance with the climb requirement of CS 29.67(a)(2);
(2) The approach and landing paths must be established with the critical engine inoperative so that the transition between each stage can be made smoothly and safely;
(3) The approach and landing speeds must be selected for the rotorcraft and must be appropriate to the type of rotorcraft; and
(4) The approach and landing path must be established to avoid the critical areas of the height-velocity envelope determined in accordance with CS 29.87.
(b) It must be possible to make a safe landing on a prepared landing surface after complete power failure occurring during normal cruise.
CS 29.81 Landing distance (ground level sites): Category A
ED Decision 2003/16/RM
The horizontal distance required to land and come to a complete stop (or to a speed of approximately 5.6 km/h (3 knots) for water landings) from a point 15 m (50 ft) above the landing surface must be determined from the approach and landing paths established in accordance with CS 29.79.
CS 29.83 Landing: Category B
ED Decision 2003/16/RM
(a) For each Category B rotorcraft, the horizontal distance required to land and come to a complete stop (or to a speed of approximately 5.6 km/h (3 knots) for water landings) from a point 15 m (50 ft) above the landing surface must be determined with:
(1) Speeds appropriate to the type of rotorcraft and chosen by the applicant to avoid the critical areas of the height-velocity envelope established under CS 29.87; and
(2) The approach and landing made with power on and within approved limits.
(b) Each multi-engine Category B rotorcraft that meets the powerplant installation requirements for Category A must meet the requirements of:
(1) CS 29.79 and 29.81; or
(2) Sub-paragraph (a).
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source