CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
in earlier paragraphs of this AMC. The controllability test techniques are covered in § AC 29.143, static stability test techniques in § AC 29.175, and the vibration test techniques in § AC 29.251.
[Amdt No: 29/11]
CS 29.1509 Rotor speed
ED Decision 2003/16/RM
(a) Maximum power-off (autorotation). The maximum power-off rotor speed must be established so that it does not exceed 95% of the lesser of:
(1) The maximum design rpm determined under CS 29.309(b); and
(2) The maximum rpm shown during the type tests,
(b) Minimum power-off. The minimum power-off rotor speed must be established so that it is not less than 105% of the greater of:
(1) The minimum shown during the type tests; and
(2) The minimum determined by design substantiation.
(c) Minimum power-on. The minimum power-on rotor speed must be established so that it is:
(1) Not less than the greater of:
(i) The minimum shown during the type tests; and
(ii) The minimum determined by design substantiation; and
(2) Not more than a value determined under CS 29.33(a)(1) and (c)(1).
CS 29.1517 Limiting height-speed envelope
ED Decision 2003/16/RM
For Category A rotorcraft, if a range of heights exists at any speed, including zero, within which it is not possible to make a safe landing following power failure, the range of heights and its variation with forward speed must be established, together with any other pertinent information, such as the kind of landing surface.
CS 29.1519 Weight and centre of gravity
ED Decision 2003/16/RM
The weight and centre of gravity limitations determined under CS 29.25 and 29.27, respectively, must be established as operating limitations.
CS 29.1521 Powerplant limitations
ED Decision 2003/16/RM
(a) General. The powerplant limitations prescribed in this paragraph must be established so that they do not exceed the corresponding limits for which the engines are type certificated.
(b) Take-off operation. The powerplant take- off operation must be limited by:
(1) The maximum rotational speed, which may not be greater than:
(i) The maximum value determined by the rotor design; or
(ii) The maximum value shown during the type tests;
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source