Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 227 · PDF page 227

(ii) If only one frequency of vibration resulting from any rpm within the normal operating range of engine or rotor system speeds is critical, that frequency of vibration must be the test frequency.

(iii) If more than one frequency of vibration resulting from any rpm within the normal operating range of engine or rotor system speeds is critical, the most critical of these frequencies must be the test frequency.

(4) Under sub-paragraph (d)(3)(ii) and (iii), the time of test must be adjusted to accomplish the same number of vibration cycles as would be accomplished in 25 hours at the frequency specified in sub-paragraph (d)(3)(i).

(5) During the test the tank assembly must be rocked at the rate of 16 to 20 complete cycles per minute through an angle of 15° on both sides of the horizontal (30° total), about the most critical axis, for 25 hours. If motion about more than one axis is likely to be critical, the tank must be rocked about each critical axis for 12½ hours.

AMC1 29.965 Fuel tank tests

ED Decision 2023/001/R

This AMC supplements FAA AC 29.965.

(a) Tests to be performed

CS 29.965 (a), (b) and (c) deal with the fuel tank pressure testing as follows:

— Sub-paragraph (a) prescribes general testing conditions.

— Sub-paragraph (b) prescribes testing conditions for conventional metal tanks, integral tanks and for non-metallic tanks with walls that are not supported by the rotorcraft structure.

— Sub-paragraph (c) prescribes pressure testing for non-metallic tanks with walls supported by the rotorcraft structure.

CS 29.965(d) deals with fuel tank vibration & slosh testing with large unsupported or unstiffened flat areas. A clear definition of ‘large unsupported or unstiffened flat area’ is provided in FAA AC 29-2C, § AC 29.965.

The intent of the tests required in sub-paragraphs (a), (b) or (c) does not cover the intent of the test required in sub-paragraph (d) and vice versa.

Therefore pressure tests, as prescribed under (a), (b) or (c), and the vibration and slosh test, as prescribed under (d), should be performed.

(b) Use of MIL-T-6396

AC 29.965 (c)(6) recognises the use of MIL-T-6396 to support the demonstration of compliance with CS 29.965. However, few clarifications are required to appropriately make use of this standard.

Combined tests

To be in line with the CS 29.965(d) requirement, the slosh and vibration test conditions shall be simultaneously applied to the test article.

Therefore the use of MIL-T-6396 should be restricted to paragraph 4.6.6 ‘Simultaneous Slosh and Vibration test’. Individual/separate performance of paragraph 4.6.7 ‘Vibrations test’ and

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.