CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
AMC 29.1583 Operating limitations
ED Decision 2016/025/R
This AMC provides further guidance and acceptable means of compliance to supplement FAA AC 29- 2C Change 4 (AC 29.1583 § 29.1583 (Amendment 29-24) OPERATING LIMITATIONS), to meet the Agency's interpretation of CS 29.1583. As such it should be used in conjunction with the FAA AC but take precedence over it, where stipulated, in the showing of compliance.
Specifically, this AMC addresses an area where the FAA AC has been deemed by the Agency as being at variance to the Agency’s interpretation. This being as follows:
b. Procedures.
(7) Kinds of operations are established under CS 29.1525. This section should contain the following preamble: ‘This rotorcraft is certified in the Large Category (category B or category A and category B) and is eligible for the following kinds of operations when the appropriate instruments and equipment required by the airworthiness and operating rules are installed and approved and are in an operable condition.’ The following, and any other kinds of operations that are applicable, should be listed.
(i) Day and night VFR.
(ii) Approved to operate in known icing conditions.
(iii) IFR.
(iv) Category A vertical operations from ground level or elevated heliports.
(v) Extended overwater operations (ditching).
(vi) External load operation.
Each operating limitation must be clear, unambiguous, and consistent with any other applicable limitation or regulatory requirement.
[Amdt 29/4]
CS 29.1585 Operating procedures
ED Decision 2018/007/R
(a) The parts of the manual containing operating procedures must have information concerning any normal and emergency procedures, and other information necessary for safe operation, including the applicable procedures, such as those involving minimum speeds, to be followed if an engine fails.
(b) For multi-engine rotorcraft, information identifying each operating condition in which the fuel system independence prescribed in CS 29.953 is necessary for safety must be furnished, together with instructions for placing the fuel system in a configuration used to show compliance with that paragraph.
(c) For helicopters for which a VNE (power-off) is established under CS 29.1505(c), information must be furnished to explain the VNE (power-off) and the procedures for reducing airspeed to not more than the VNE (power-off) following failure of all engines.
(d) For each rotorcraft showing compliance with CS 29.1353(c)(6)(ii) or (c)(6)(iii), the operating procedures for disconnecting the battery from its charging source must be furnished.
(e) If the unusable fuel supply in any tank exceeds 5% of the tank capacity, or 3.8 litres (0.8 Imperial gallon/1 US gallon), whichever is greater, information must be furnished which indicates that
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source