CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
(3) The maximum allowable torque.
(j) Rated 2-minute OEI power operation. Rated 2-minute OEI power is permitted only on multi- engine, turbine-powered rotorcraft, also certificated for the use of rated 30-second OEI power, and can only be used for continued operation of the remaining engine(s) after a failure or precautionary shutdown of an engine. It must be shown that following application of 2-minute OEI power, any damage will be readily detectable by the applicable inspections and other related procedures furnished in accordance with paragraph A29.4 of Appendix A of CS-29. The use of 2-minute OEI power must be limited to not more than 2 minutes for any period in which that power is used, and by:
(1) The maximum rotational speed, which may not be greater than:
(i) The maximum value determined by the rotor designs; or
(ii) The maximum value demonstrated during the type tests;
(2) The maximum allowable gas temperature; and
(3) The maximum allowable torque.
AMC1 29.1521 Powerplant limitations
ED Decision 2023/001/R
(a) Introduction
This AMC supplements FAA AC 29-2C, § AC 29.1521 and should be used in conjunction with that AC when demonstrating compliance with CS 29.1521.
(b) 30-minute power rating
(1) Explanation
The 30-minute power rating may be set at any level between the maximum continuous up to and including the take-off rating, and may be used for multiple periods of up to 30 minutes each, at any time between the take-off and landing phases in any flight.
This rating is associated with some limitations which should be adequately established and declared.
(2) Procedure
CS 29.1521(a) refers to the limits for which the engines are type certificated. This should include the 30-minute power rating usage and:
— the associated usage limit:
— maximum duration in one single shot up to 30 minutes;
— cumulative limit, if any, in one flight; and
— any other limits associated with the usage of the 30-minute power rating declared in the installation and/or operating manual of the engine.
[Amdt No: 29/11]
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source