EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 317 · PDF page 317

(26) For each turbine engine utilising 30-second/2-minute OEI power, a device or system must

be provided for use by ground personnel which:

(i) Automatically records each usage and duration of power at the 30-second and 2- minute OEI levels;

(ii) Permits retrieval of the recorded data;

(iii) Can be reset only by ground maintenance personnel; and

(iv) Has a means to verify proper operation of the system or device.

(27) For rotorcraft for which a 30-minute power rating is claimed, a means must be provided

to alert the pilot when the engines are at the 30-minute power rating levels, when the event begins, when the time interval expires and, if a cumulative limit in one flight exists, when the cumulative time in one flight is reached.

(b) For Category A rotorcraft:

(1) An individual oil pressure indicator for each engine, and either an oil pressure warning for each engine or a master warning device for all engines with means for isolating the individual warning circuit from the master warning device;

(2) An independent fuel pressure warning device for each engine or a master warning device for all engines with provision for isolating the individual warning device from the master warning device;

(3) Fire warning indicators; and

(4) When the OEI Training Mode is prescribed, a means must be provided to indicate to the pilot the simulation of an engine failure, the annunciation of that simulation, and a representation of the OEI power being provided.

(c) For Category B rotorcraft:

(1) An individual oil pressure indicator for each engine; and

(2) Fire warning indicators, when fire detection is required.

[Amdt. No. 29/2] [Amdt No: 29/10] [Amdt No: 29/11]

AMC1 29.1305(a)(4) Powerplant instruments

ED Decision 2023/001/R

FUEL QUANTITY INDICATOR AND LOW-FUEL LEVEL WARNING

This AMC provides guidance in the case where the fuel quantity indicator and the low-fuel warning device are not fully independent.

AC 29.1305 provides guidance that supports the use of specific instruments that do not meet the principle of independence (integrated avionics, ECAS, etc.). However, it does not provide guidance regarding the independence between the fuel quantity sensor and the fuel low-level sensor.

The fuel quantity sensor and the fuel low-level sensor should be independent. However, it is considered to be acceptable to place them on the same supporting structure providing that the following design precautions are ensured:

(a) They are electrically independent. Each sensor should be connected to the aircraft systems via a dedicated connector and a dedicated harness;

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.