EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 35 · PDF page 35

CS 29.59 Take-off Path: Category A

ED Decision 2003/16/RM

(a) The take-off path extends from the point of commencement of the take-off procedure to a point at which the rotorcraft is 305 m (1000 ft) above the take-off surface and compliance with CS 29.67(a)(2) is shown. In addition:

(1) The take-off path must remain clear of the height-velocity envelope established in accordance with CS 29.87;

(2) The rotorcraft must be flown to the engine failure point at which point the critical engine must be made inoperative and remain inoperative for the rest of the take-off;

(3) After the critical engine is made inoperative, the rotorcraft must continue to the TDP, and then attain VTOSS.

(4) Only primary controls may be used while attaining VTOSS and while establishing a positive rate of climb. Secondary controls that are located on the primary controls may be used after a positive rate of climb and VTOSS are established but in no case less than 3 seconds after the critical engine is made inoperative; and

(5) After attaining VTOSS and a positive rate of climb, the landing gear may be retracted.

(b) During the take-off path determination made in accordance with sub-paragraph (a) and after attaining VTOSS and a positive rate of climb, the climb must be continued at a speed as close as practicable to, but not less than, VTOSS until the rotorcraft is 61 m (200 ft) above the take-off surface. During this interval, the climb performance must meet or exceed that required by CS 29.67(a)(1).

(c) During the continued take-off the rotorcraft shall not descend below 4.6 m (15 ft) above the take-off surface when the TDP is above 4.6 m (15 ft).

(d) From 61 m (200 ft) above the take-off surface, the rotorcraft take-off path must be level or positive until a height 305 m (1000 ft) above the take-off surface is attained with not less than the rate of climb required by CS 29.67(a)(2). Any secondary or auxiliary control may be used after attaining 61 m (200 ft) above the take-off surface.

(e) Take-off distance will be determined in accordance with CS 29.61.

CS 29.60 Elevated heliport take-off path: Category A

ED Decision 2003/16/RM

(a) The elevated heliport take-off path extends from the point of commencement of the take-off procedure to a point in the take-off path at which the rotorcraft is 305 m (1 000 ft) above the take-off surface and compliance with CS 29.67(a)(2) is shown. In addition:

(1) The requirements of CS 29.59(a) must be met;

(2) While attaining VTOSS and a positive rate of climb, the rotorcraft may descend below the level of the take-off surface if, in so doing and when clearing the elevated heliport edge, every part of the rotorcraft clears all obstacles by at least 4.6 m (15 ft);

(3) The vertical magnitude of any descent below the take-off surface must be determined; and

(4) After attaining VTOSS and a positive rate of climb, the landing gear may be retracted.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.