EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 419 · PDF page 419

KPI-2.1 < 1E-03 per fleet flight hour

2. Data availability KPI-2: Number of events in which VHM data available for review was not enough for complete indicator condition evaluation and additional analysis

3. Data review KPI-3.1: Average VHM data review interval KPI-3.1 < MIDR on all individual rotorcraft

KPI-3.2 < 0.1 % of VHM data reviews for the fleet

KPI-3.2: % of VHM data reviews with completely or partially unavailable data for review (e.g. unsuccessful downloads, storage exceeded, etc.)

KPI-4.1 = 100 %

4. Fault detection performance (See note below)

KPI-4.1: % of in-service events involving monitored components whose damage/degradation has been identified by the VHM monitoring approach

KPI-4.2 < 0.1 % for each individual rotorcraft

KPI-4.2: % of computed indicator values for healthy and degraded components exceeding expected values

5. VHM system ‘hardware’ reliability

KPI-5.1 < 1E-05 per fleet flight hour and < 1E-03 for each individual VHM system element

KPI-5.1: VHM system faults leading to unavailability of system functions per flight hour, with identification of the affected element

KPI-5.2 < 1E-05 per fleet flight hour

KPI-5.2: VHM system faults leading to loss or erroneous data for more than one VHM data review interval per flight hour

6. Ground-based system software reliability

KPI-6.1: Number of ground-based system software errors identified affecting system functionality

KPI-6.1: Minimised, while ensuring that VHM system objectives are fulfilled

KPI-6.2: Qualitative operator feedback on ground-based software reliability

KPI-6.2: Consistent positive feedback

KPI-7.1 < 0.1 hours per fleet flight hour

7. Maintenance and troubleshooting burden

KPI-7.1: Rotorcraft unavailability (hour/flight hour) due to unscheduled action following VHM system alert that is then not confirmed as an alarm

KPI-7.2: Alarms/alerts ratio KPI-7.2 > 0.2

KPI-7.3: False alarms/flight hour KPI-7.3 < 1E-03 per fleet flight hour and < 1E-02 per individual rotorcraft flight hour 8. VHM usability and maintainability

KPI-8: Qualitative feedback from operators on system usability and maintainability

KPI-8: Consistent positive feedback

KPI-9.1: Agreed by all operators

9. Effectiveness and completeness of the ICA

KPI-9.1: Alert management procedures, including maintenance tasks and instructions for fault isolation are considered complete and effective by operators

KPI-9.2 = 100 %

KPI-9.2: % of Alerts effectively addressed within defined alert management procedures

Note: KPIs 4.1 and 4.2 address the detection of incipient failures on the VHM monitored components. These KPIs should only be computed in cases when such events take place during

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.