CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
— improvement of the prognostic capability and/or probability of detection;
— support in the identification of VHM false alerts;
— support in the identification of faults on the VHM system.
(B) Trend monitoring and AAD/ADT may be used by the applicant as part of the alerting criteria used in the applications of the VHM system for which approval is sought. If so, they must be subject to the same compliance demonstration as traditional alerting, as defined in AMC1 29.1465. In addition, since both traditional alerting as well as these alternative means of alerting may exist simultaneously, instructions should be provided regarding how to proceed for each possible combination of indications.
(C) If trend monitoring and/or AAD/ADT are not part of the performance validation performed in support of the compliance demonstration, they should be considered as a supplementary feature of the VHM system and, therefore, not required for airworthiness purposes. In this case, they should not be relied upon for VHM applications for credit, neither directly nor in combination with traditional condition indicators nor in support of alert management decisions.
(2) The applicant may rely on different priority levels for the alerts produced by the system in order to ensure that the intended functions from the system are fulfilled minimising the impact on operations and rotorcraft availability. The applicant may define the alert priority levels and associated display colours considered most appropriate. Nevertheless, the following approach is proposed for reference:
(i) Priority level 3 — advisory alerts: provided for information and maintenance planning purposes. These may be highlighted in any colour, provided it differs sufficiently from red, amber/yellow and green.
(ii) Priority level 2 — amber/yellow alerts: typically used to indicate the need for alert verification and subsequent further investigation or corrective action to be taken within a certain interval. Operations may be continued during this interval. A certain level of additional VHM data analysis may be required prior to continuing operations for the established interval.
(iii) Priority level 1 — red alert: typically provided to indicate the need for alert verification and corrective action to restore the monitored system to a serviceable condition before the next flight.
(3) To ensure that alerts are reviewed at adequate intervals and maximise the prognostic capability of the VHM system, the applicant may consider ensuring that the VHM data is reviewed at intervals not exceeding 15 flight hours. This is in line with industry best practices. Therefore, it is desirable that the VHM system design can support the storage and download needs to fulfil this objective.
(e) Probability of fault detection — Methodology example
(1) Assumptions considered within this example:
(i) The alerting criteria of the VHM application for credit rely on a single condition indicator with a fixed threshold.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source