EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 398 · PDF page 398

(A) justify the adequacy of the mechanical response(s) targeted as a reliable indication of damage or degradation associated with incipient failures for each monitored component;

(B) detail why the sensor location, signal(s) acquired and subsequent processing are considered appropriate for early detection;

(C) justify that the initial alerting criteria and the processes used to adjust them in service provide adequate detection capability, while ensuring acceptable false alarm rates. This justification should consider the VHM system design characteristics and the proposed ICA to be followed in the event of an indication from the system;

(D) include in the design assessment required by CS 29.1465(b)(1) consideration of the characteristics of the failure progression for each part to support the existence of an adequate PI prior to ultimate failure. These characteristics should be derived from the applicant’s experience and industry know-how. This consideration should be taken into account at the time of defining the recommended and maximum intervals of VHM data acquisition and review defined in accordance with points (e)(1) and (2) of this AMC. It should be ensured that these intervals maximise the possibilities of early detection wherever it is deemed feasible and practical.

Note: When showing compliance with CS 29.1465(b)(2), the applicant may choose to use Table 1 of GM1 29.1465 for reference. However, it is not always necessary for the VHM system to cover the complete capability defined in this table. If alternative methods are proposed, which can be shown to be effective and reliable and which are to the satisfaction of the Agency, then these can also be accepted.

(3) Purpose of the controlled service introduction (CSI)

As a result of the limited or no supporting direct evidence for these VHM applications, the performance demonstration should be subject to validation in service through the completion of a CSI, as detailed in paragraph (k) of this AMC. When defining the CSI plan for VHM applications for compliance with an operational regulation, the applicant should typically take into consideration the following:

(i) The demonstration of performance would rely significantly on assumptions, which may include the read-across of data from similar applications or the use of engineering judgement. Therefore, the applicant should carefully identify the characteristics of VHM system and/or aspects of its implementation that require evaluation in service and plan the CSI accordingly.

(ii) The applicant should also ensure that appropriate data is gathered during the CSI to confirm, set and/or adjust alerting criteria as required. When no initial alerting criteria are defined for certain components at the time of approval because of insufficient data, the applicant should ensure that the necessary data to define the missing alerting criteria is gathered within the minimum interval possible.

(iii) A VHM system approved in support of compliance with an operational regulation should be clearly recorded as such in the TCDS, and its implementation for this purpose should not be dependent upon completion of the CSI.

(i) Ground-based system

(1) General considerations

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.