CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
(E) Typically, implementation of the full credit will require a separate approval following gathering and evaluation of the in-service data.
(h) VHM applications in support of compliance with an operational regulation
This paragraph provides specific Acceptable Means of Compliance for VHM systems that are relied upon to support compliance with an operational regulation. These are expected to provide a minimum level of additional safety by increasing the likelihood of early detection of incipient failures. Nevertheless, applicants developing VHM systems on a ‘no hazard/no credit basis’ are advised to follow the content of this AMC, including subparagraph (2) of this section as guidance for establishing adequate system performance.
(1) Monitoring scope
In order to substantiate that the VHM system provides the aforementioned additional safety, the applicant should demonstrate that the scope of components being monitored is in line with that defined in the operational regulation that the system is intended to support compliance with.
For point SPA.HOFO.155 of Regulation (EU) No 965/2012, the scope is defined as ‘critical rotor and rotor drive systems’ and further clarified in associated AMC as ‘rotating critical components’. This should be understood as parts of the rotors and rotor drive systems, the failure of which could prevent continued safe flight or safe landing, or whose failure could have catastrophic and/or hazardous consequences.
As specified in CS 29.1465(b)(3), VHM may not be required for some of these parts, provided that alternative means of monitoring are provided. For many failure modes, there may be other compensating provisions which can provide protection against the risk of premature failure. Nevertheless, the purpose of operational regulations that mandate the fitment of VHM systems is typically an additional safety benefit by means of an increased likelihood of early detection of incipient failures. However, it will not be necessary to implement VHM for a given failure mode if no safety benefit may be established. For establishing the safety benefit of implementing VHM, the applicant should consider the capability that the system may achieve after introduction into service through the gathering of data from the fleet and the development of improved indicators and alerting criteria.
In addition, CS 29.1465(b)(3) also states that other means of health monitoring need to be substantiated when VHM monitoring is not provided for components within the scope of the operational regulation requirements. Such other means of health monitoring may be any alternative system (e.g. chip detection, temperature monitoring, etc.) or continuing airworthiness tasks which are demonstrated to adequately identify the presence of damage or degradation on these components.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source