EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 392 · PDF page 392

data points for evaluating the characteristics of the failure progression, if needed (see note immediately after Table 2 in (v) below). In principle, this number should be established independently for the evaluation of the failure progressions characteristics and the likelihood of detection.

When determining the direct evidence data points required for each performance demonstration aspect (i.e. (i)(A) and (i)(B) above), the applicant should establish the performance demonstration ‘class’. The performance demonstration ‘class’ reflects the potential impact on safety as well as the likelihood of an incorrect assumption as part of the compliance demonstration for CS 29.1465. It takes into consideration the complexity of the application, the safety margins and any mitigating actions. ‘Class 1’ reflects the highest potential impact on safety, while higher ‘class’ numbers are used as this potential impact reduces.

To determine the performance demonstration ‘class’ of a VHM application for credit, the following points should be taken into consideration:

(A) The ‘complexity’ of the VHM application, which effectively represents the difficulty to adequately characterise the performance demonstration aspects considering the variability and scatter they are subject to, as well as the number of parameters that have an influence.

(a) ‘Complexity’ from a failure progression characteristics point of view

The applicant should evaluate the repeatability and capability to reach a good understanding of the failure progression characteristics. In order to support this demonstration for ‘non-complex’ VHM applications, it should be demonstrated that the variability can be understood and that the scatter is limited. For this purpose, the applicant should consider the following:

(1) Test results at similar conservative operating conditions and comparable parameters should be assessed.

(2) The maximum scatter (i.e. obtained from comparable data) for a ‘non-complex’ system should be limited to a factor of 10 between the maximum and the minimum operating times to failure.

(3) When a limited scatter of the rate of failure progression cannot be demonstrated or the variability and/or scatter evaluation are not performed in sufficient detail, the VHM application should be considered as ‘complex’ regarding its failure progression characteristics.

(b) ‘Complexity’ from a likelihood of detection point of view

In order to justify a VHM application for credit as ‘non-complex’, it should be clearly established that the indicator(s) for the degraded and healthy conditions result in clearly differentiated distributions. For this purpose, the applicant should:

(1) identify and quantify any significant source of variability impacting the likelihood of fault detection;

(2) consider that the application should be considered as ‘complex’ when:

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.