CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
The likelihood of fault detection should be evaluated in accordance with (i)(B) above.
The applicant should demonstrate that, from the point the degraded condition is considered clearly detectable in any failure progression scenario, there will be very high chances of triggering an alert at each opportunity at which the condition indicators are assessed against the alerting criteria. An example of such demonstration is provided in GM1 29.1465(e).
(iii) Considerations regarding the direct evidence used for the demonstration of performance
(A) Direct evidence data points
The applicant should define adequate and sufficient direct evidence to complete the demonstration of performance for the aspects described in (i)(A) and (i)(B) above. Each individual element of direct evidence (i.e. test, in-service event, etc.) should be considered as a single data point.
The number of direct evidence data points needed for the demonstration of performance would typically depend on characteristics of the application such as the variability and/or the scatter exhibited by the failure progression and the likelihood of detection. The sufficiency of the direct evidence data points used may only be confirmed at the end of demonstration of performance. At this point, it should be verified that the performance demonstration aspects have been adequately addressed (see (i)(A) and (B)) and the performance objectives are met.
Nevertheless, it would typically be relevant for the applicant to be able to estimate the number of direct evidence data points at the beginning of the design and development of a VHM application for credit. In order to establish and justify the number of direct evidence data points initially planned for each performance demonstration aspect, the applicant may choose to:
— rely on established methods,
— follow the process described in Figure 6 below, or
— propose an alternative approach.
Established methods are expected to already be in place to assess the failure progression characteristics for at least certain kinds of failure mechanisms (e.g. fatigue cracking failures addressed by CS 29.571/573). In addition, when a VHM application for credit is introduced to replace other means of monitoring or continuing airworthiness task(s), the applicant may already possess data characterising the failure progression. In these cases, the applicant should evaluate whether the available data is adequate and sufficient to complete the demonstration without further testing.
In the absence of established methods, Figure 6 below, summarises the process described in (iv) to identify the ‘class’ of an application for credit and, based on this, the number of direct evidence data points, as specified in (v).
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source