AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
complying with Objective 3 include using the tests required by the MOC for Objectives 1, 2 and 7 to demonstrate that all emitted gasses are contained or vented overboard through designed ports. Objective 3 does allow explosive and toxic gases to be uncontained and not vented overboard if they do not accumulate in hazardous quantities within the rotorcraft. If you choose to use the test data to demonstrate compliance by this means, explain how you will demonstrate that hazardous quantities of gases will not accumulate within the rotorcraft. If your design will have ports to vent gases overboard, ensure there is a means to protect ground personnel from exposure to these gases.
iii. MOC for Objective 4: Section AC 27.863 of this guidance, subparagraph (c), provides an acceptable method of compliance for flammable fluids.
iv. MOC for Objective 5:
(a) Show that if fluid escapes the battery, it is not corrosive or it is managed in a way (e.g., contained, isolated or vented overboard) that protects the surrounding structure and adjacent systems, equipment, and electrical wiring.
(b) Any failure of the battery includes, but is not limited to, internal and external short circuit. See the tests listed in the MOC for Objectives 1, 2, and 7 for Failure Conditions that are evaluated.
v. MOC for Objective 6:
(a) Force a cell in the battery into thermal runaway by conducting the RTCA Document DO-347, section 2.3.15, Thermal Runaway Containment Test. Perform step e. of test method 2.3.15.1 in lieu of steps c. and d. when conducting this test.
(b) Show that the effects of the heat and any related effects do not constitute a hazard to the structure or systems of the rotorcraft. If the effects of the heat or any related effects constitute a hazard to the structure or systems of the rotorcraft, design mitigation at the aircraft level may be applied to bring the design into compliance with Objective 6.
vi. MOC for Objective 8: A well designed disconnection system will function during the tests required by the MOC for Objectives 1, 2, and 7, except for the test in RTCA Document DO-347, section 2.3.9, where the protection is already disabled. This is one of the means of preventing the Failure Conditions discussed in the Evaluation Criteria sections of RTCA Document DO-347 for these tests. Confirm the battery automatically disconnects from its discharging circuit during these tests.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source