AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
2. The following means of compliance (MOC) have been accepted to ensure that the battery meets the objectives discussed above. Some failures may still occur due to various factors beyond the control of the designer; these MOCs are also intended to protect the rotorcraft if such failures occur.
Note: Some of the methods below reference RTCA DO-347, Certification Test Guidance for Small and Medium Size Rechargeable Lithium Batteries and Battery Systems, dated December 18, 2013. Although DO-347 provides standards for small and medium sized rechargeable lithium batteries, the FAA considers these tests appropriate as guidance for similar sized non-rechargeable lithium batteries. Procedures that are only applicable to rechargeable batteries (such as connecting input power) need not be performed. When a test method specifies charging the battery before the test, a new fully charged battery should be used.
i. MOC for Objectives 1, 2, and 7:
(a) Meets the requirements in paragraph 3 of TSO-C142a, Non- rechargeable Lithium Cells and Batteries;
(b) Meets the criteria to pass in Appendix 1, Table 2 of TSO-C142a; and
(c) Passes the following tests in RTCA Document DO-347:
1. Section 2.3.7 Short-circuit Test of a Cell
2. Section 2.3.8 Short-circuit Test with Protection Enabled
3. Section 2.3.9 Short-circuit Test with Protection Disabled
4. Section 2.3.10 Insulation Resistance Test
5. Section 2.3.15 Thermal Runaway Containment Test: Perform step e. of test method 2.3.15.1 in lieu of steps c. and d.
(d) Objective 1 requires that each individual cell within a battery be designed to maintain safe temperatures and pressures. These same issues are also critical at the battery level. Objective 2 requires the battery to be designed to prevent propagation of a thermal event (i.e., self-sustained, uncontrollable increases in temperature or pressure) from one cell to adjacent cells.
ii. MOC for Objective 3: RTCA Document DO-347, section 3.1.3 discusses potential gas emissions from batteries and their effects. Acceptable means of
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source