AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
Hose Encl
Pitting
~l.ze
F1tt1n_g Type
Tension Load l:lbi Ben din!'. Lx:r.ad ! lb) Mirnmlim Mlnfmlim ' M1n1murn Mlnimlim Av~raga lrtdiv1dual Av1erage lr1di1Ndual. LG.acl' .w ad Load' Lo,ad
BTRAlGHT
600 475 425 ,400.
-4
-6
70.Q :F.,75 425 4l!f.Q
-8
650 650 fil!fQ
-40
1450 ·1175 1575 625'
Tensil:ln = t Jim
8§0
-'lo
2'125 1300
!Bep,:Jing = t p-
-2D
Z.075.
,475 ,425
-4
HO.,, Pl ROW
7QO' 57!5
-8
800 65.0 450 4(J0
'1175 47.S 425
Tension= i ~
14?5 450
2t25 ' 775 7illCT
2375 2075 1100 100'0
E:'.entlit1~ = t I
FIGURE' AC27_g52,i ll'~l~JIMUM AVERA~E AhJDilNDIVIDLJ,AL LOAD$ FOP
H0 ,~IE AN0 HCt~E--EltlD FITTI ~.IG C0 MBl'NATl(llxlS
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source